Cost Feasible Plan & TPA Priorities

Vision 2050 is required to include a financial plan that establishes "Cost Feasible" transportation priorities — those projects that can reasonably be expected to be completed based on available revenues through the horizon year of 2050. This Cost Feasible Plan reflects the TPA's priorities for expenditures of federal and state funds in Palm Beach County.

Additional transportation priorities supported by the TPA but not completable based on available financial resources may be included for "Illustrative" purposes. Those that are fully planned and supported may require discretionary funding to advance to implementation.

Programming Time Bands

The Cost Feasible Plan programs available funding over the following time bands:

  • FY 25–29 (the TPA's currently adopted Transportation Improvement Program)
  • FY 30–35
  • FY 36–40
  • FY 41–50

Financial Summary

Cost Feasible TPA Table Summary (in thousands)
Category FY 25–29 FY 30–35 FY 36–40 FY 41–50 Total Unfunded (incl. Illustrative)
TPA Revenues$434,499$244,230$208,080$418,770$1,305,579
TPA Prioritized Expenditures$410,062$162,333$148,734$298,030$1,019,158$5,178,304
TA Set-Aside$24,437$33,674$28,080$5,616$91,807
Balance$48,223$31,266$115,124$194,614
Cost Feasible SIS Table Summary (in thousands)
Category FY 25–29 FY 30–35 FY 36–40 FY 41–50 Total Unfunded (incl. Illustrative)
FDOT Expenditures$433,384$282,509$286,143$2,847,432$3,849,468$10,055,690
Turnpike Expenditures$1,195,700$745,041$—$—$1,940,741$4,007

Project Table Summaries

The following tables contain the full project-level detail for each funding category. Each table opens in a scrollable region and includes all projects with their LRTP reference number, FM number, description, and costs broken down by phase (PDE, PE, ROW, CST) and time band. Use the links below to jump directly to each table.

TPA Priorities — Cost Feasible

197

Projects supported by the TPA for federal and state funding, within available revenues through 2050.

View full table ↓

TPA Priorities — Illustrative Projects

92

TPA-supported projects that align with Goals and Objectives but do not have cost-feasible funding available for implementation.

View full table ↓

Maintenance Projects

33

Ongoing operations and maintenance of the transportation system, including larger-scale maintenance projects funded by federal and state sources.

View full table ↓

Airports & Seaports Projects

104

Specific projects carried out by seaport and airport partner agencies, supported by the TPA for federal and state discretionary grants.

View full table ↓

Project Data Tables

Full project listings with costs by phase and time band. All costs in thousands of dollars. Use the scroll region to navigate wide tables horizontally, or use keyboard arrow keys after focusing the table region.

TPA Priorities — Cost Feasible

All costs in thousands of dollars. 197 projects listed.

TPA Priorities — Cost Feasible: Project costs by funding phase (FY 2024–2050), in thousands of dollars
Project Information Present Day Costs FY24 (in thousands) Previous FY 25–29 FY 30–35 FY 36–40 FY 41–50 CF Total Unfunded
Project Name LRTP # FM # Description PDE PE ROW CST Total O&M PDEPEROWCST PDEPEROWCST PDEPEROWCST PDEPEROWCST
25th St Complete Street from Australian Ave to Broadway Ave LI-19-4 4460901 Complete Streets - 4 to 3 Lane Repurposing, R/R gates, ADA, buffered bicycle lane, lighting, sidewalks $7,038 $7,038 $5 $7,033 $7,038
36th St Complete Street from Australian Ave to Poinsettia Ave in West Palm Beach LI-17-1-5 4415701 Complete Streets - Construct buffered bicycle lanes, sidewalks, grade separated pedestrian bridge $12,296 $12,296 $1,370 $10,926 $12,296
49th St complete street from Greenwood Ave to North Flagler Drive TA-22-3 4508621 Complete Streets - ADA curb ramps, sidewalks, traffic calming, sharrows $565 $565
7th St complete street from Australian Ave to Tamarind Blvd LI-23-4 TBD Complete Streets - Buffered bicycle lanes, sidewalk widening $1,848 $1,848 $2,458 $2,458
Alt A1A Complete Street from Lighthouse Dr to Donald Ross Rd PBG0001 Complete Streets - Grade separated pedestrian bridge at 2 locations, sidewalk widening, shared-use paths. The City is also supportive of a 8’ pathway on the W side of the road, in addition to the East side already noted. $274 $1,643 $10,680 $12,597 $364 $364 $12,323
Atlantic Ave (SR 806) Complete Street from NW 12th Ave to NW 2nd Ave DEL0011 Complete Streets - Complete streets design / beautification $42 $253 $1,647 $1,942 $56 $56 $1,900
Atlantic Ave (SR 806) Intersection Improvements @ Congress Ave DEL0009 Complete Streets - Pedestrian, bicycle, accessibility, safety $56 $336 $2,184 $2,576 $74 $541 $3,517 $4,132
Avenue A Complete Streets from 4th Ave to Main St BEL0001 Complete Streets - Complete street $83 $83 $94 $94
Barwick Rd from Lake Ida Rd to Sabal Lakes Rd (N) LI-22-5 4507931 Complete Streets - Shared use path, sidewalk $2,531 $2,531 $5 $2,091 $2,096
Blue Heron Blvd (SR 708) Complete Street from I 95 to ICWW RB0001 Complete Streets - Corridor study $1,000 $1,000 $1,330 $1,330
Brant Bridge connector from Lindell Blvd to Brant Bridge LI-17-7 4415861 Complete Streets - Sidewalks, separated bicycle lane $2,540 $2,540 $5 $2,535 $2,540
Burns Rd from Military Trl to Alt A1A TA-21-1 4490051 Complete Streets - Separated bicycle track $1,400 $1,400
C-2 Canal from Greenview Shores Blvd to Bent Creek Rd LI-20-5 4483061 Complete Streets - Shared use path $616 $616 $5 $549 $554
C-8 Canal from Forest Hill Blvd to Stribling Way TA-21-4 4490061 Complete Streets - Shared use path $734 $734
Camino Real from Spanish River Rd to South Ocean Blvd TA-23-2 TBD Complete Streets - Buffered bicycle lanes, sidewalk $5 $1,362 $1,367
Congress Ave (SR 807) Complete Street from City of Boca Raton to City of Boynton Beach DEL0012 Complete Streets - Sidewalk, bicycle lane, ADA, safety $231 $1,388 $9,021 $10,640 $308 $308 $10,408
Congress Ave (SR 807) Safety and Transit Improvements from Lake Worth Rd to Forest Hill Blvd MP-21-2 4498791 Complete Streets - Lighting, crosswalks, intersection, transit stops $2,966 $2,966 $434 $2,532 $2,966
Cresthaven Blvd from S Jog Rd to S Military Trl LI-19-2 4460861 Complete Streets - Buffered bicycle lane, intersection modifications $4,603 $4,603 $5 $4,597 $4,602
Dolan St Complete Street from Sylvia Ln to Congress Ave PS0004 Complete Streets - Sidewalk, bicycle Lane $8 $48 $314 $370 $11 $11 $362
Fairchild Ave from Fairchild Gardens Ave to Campus Dr TA-22-2 4508291 Complete Streets - Buffered bicycle lane, pathway $1,408 $1,408
Federal Hwy @ Spanish River Blvd MP-20-1 4482641 Complete Streets - Intersection modification, bicycle lane, traffic signal hardening $1,715 $1,715 $300 $2,281 $2,581
Federal Hwy Intersection Improvements @ 20th Street BOC0024 Complete Streets - Safety, traffic signals $67 $400 $2,599 $3,065 $89 $532 $4,184 $4,804
Flagler Dr Complete Street from Gregory Place to 59th Street WPB0051 Complete Streets - Roadway modification, landscaping, bicycle lanes, sidewalks, safety $569 $3,416 $22,203 $26,189 $757 $4,543 $35,747 $41,048
Gardens Pkwy Complete Street from Alt A1A to Prosperity Farms Rd PBG0012 TBD Complete Streets - Pathway, bicycle lanes $105 $631 $4,103 $4,840 $5 $4,620 $4,625 $105
Grapeview Blvd from Key Lime Blvd to 60th St and Key Lime Blvd from Hall to M-1 Canal TA-21-3 4490021 Complete Streets - Shared use path, pathway $1,658 $1,658
Greenbriar Blvd from Aero Club Drive to Greenview Shored Blvd. LI-20-4 4482991 Complete Streets - Bicycle lanes $2,453 $2,453 $5 $2,421 $2,426
Greenbrier Dr Complete Street from Davis Rd to Congress Ave PS0002 Complete Streets - Sidewalk, bicycle lanes $36 $217 $1,411 $1,665 $48 $48 $1,628
Greenview Shores Blvd from Binks Forest Dr to Wellington Tr LI-19-6 4460821 Complete Streets - Bicycle lanes $1,258 $1,258 $5 $1,253 $1,258
Hamlin Blvd from Hall Blvd to Grapeview Blvd; Grapeview Blvd from Hamlin Blvd to Citrus Grove Blvd; Citrus Grove Blvd from Hall Blvd to Avocado Blvd TA-22-1 4507871 Complete Streets - Shared use path, pathway $1,300 $1,300
Holly Dr Complete Street from N. Military Trail to Lighthouse Dr PBG0015 Complete Streets - Widen sidewalk, crosswalks, grade separated pedestrian bridge $37 $221 $1,435 $1,692 $59 $59 $1,656
Hood Rd Complete Street from Jog Rd to Alt A1A PBG0009 Complete Streets - Shared use path, bicycle lanes, sidewalk $200 $1,202 $7,816 $9,219 $267 $267 $9,019
ITID Pathways along 140th Ave N from Orange St to 61st St N and 61st St N from 140th Ave N to the M-1 Canal TA-23-5 TBD Complete Streets - Pathway $5 $526 $531
ITID Pathways along 140th Ave N, Temple Blvd, and Hall Blvd LI-23-1 TBD Complete Streets - Shared use path, pathway $5,369 $5,369 $7,141 $7,141
Kyoto Gardens Dr Complete Street from N Military Trail to Fairchild Gardens Ave PBG0002 Complete Streets - Intersection reconstruction, roundabout, shared use path, bicycle lanes, lane narrowing $73 $440 $2,860 $3,373 $118 $118 $3,300
Lake Ave Complete Street from Belvedere Rd and Southern Blvd WPB0056 Complete Streets - Lane narrowing, landscaping, bicycle lanes, safety $67 $404 $2,629 $3,101 $109 $109 $3,033
Lake Ida Rd Intersection Improvements @ N Congress Ave DEL0008 Complete Streets - Pedestrian, bicycle, accessibility, safety $56 $336 $2,184 $2,576 $90 $541 $3,517 $4,148
Lilac St from North Military Trl to Plant Dr TA-23-4 TBD Complete Streets - Shared use path, pathway, crosswalk $5 $1,144 $1,149
Linton Blvd Intersection Improvements @ S Congress Ave DEL0010 Complete Streets - Pedestrian, bicycle, accessibility, safety $56 $336 $2,184 $2,576 $74 $447 $2,905 $3,427
Mercer Ave Complete Street from Belvedere Rd to Australian Ave WPB0060 Complete Streets - Maintenance, curb relocation, drainage, landscaping, ADA $3,735 $22,409 $145,658 $171,802 $4,967 $4,967 $168,067
Military Trl (SR 809) Complete Street from C-17 Canal to Donald Ross Rd PBG0018 Complete Streets - Widen sidewalks, shared use paths, crosswalks, sidewalk, ADA, bicycle boulevard $258 $1,546 $10,048 $11,852 $415 $415 $11,594
Military Trl (SR 809) Shared Use Path from Town Center Mall to Spanish River Park BOC0039 Complete Streets - Shared use path $250 $250 $333 $333
Mizner Blvd Complete Street from S Federal Hwy to N Federal Hwy BOC0034 Complete Streets - Complete Streets: Multimodal Accommodations $66 $398 $2,589 $3,054 $107 $107 $2,988
Northlake Blvd Complete Street from PBG City limits to Congress Ave PBG0016 Complete Streets - Sidewalk widening, shared use path, crosswalks $107 $639 $4,155 $4,900 $142 $142 $4,794
NW 2nd Ave Complete Street from E Palmetto Park Rd to NW 67th St BOC0038 Complete Streets - Protected bicycle lanes $281 $1,685 $10,951 $12,917 $452 $452 $12,636
NW 6th Way from South of NW 38th Drive/Circle to Spanish River Blvd TA-23-1 TBD Complete Streets - Shared use path, intersection modifications $5 $969 $974
Okeechobee Gateway from West of Australian Ave to the ICWW TPA0014 Complete Streets - Corridor Study $2,000 $2,000 $2,000 $2,000
Old Dixie Hwy Complete Street from Linton Blvd to SE 10th St DEL0004 Complete Streets - Corridor Study $34 $205 $1,333 $1,572 $45 $273 $2,146 $2,464
Old Okeechobee Rd Complete Street from Mercer Ave to Parker Ave WPB0061 Complete Streets - Maintenance, roadway, sidewalks, ADA, protected bicycle lanes, crosswalks $33 $196 $1,272 $1,500 $65 $65 $1,468
Palm Beach Lakes Complete Street from Okeechobee Blvd 7th Street WPB0055 Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience $141 $843 $5,481 $6,464 $226 $226 $6,324
Palmetto Park Road Complete Street from SW 3rd Ave to A1A BOC0030 Complete Streets - Corridor study $89 $535 $3,479 $4,104 $119 $119 $4,015
Parker Ave Complete Street from Belvedere Rd to Okechobee Blvd WPB0062 Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience $71 $428 $2,783 $3,283 $115 $115 $3,212
PGA Blvd (SR 876) Complete Street from Beeline Hwy to Prosperity Farms Rd PBG0013 Complete Streets - Shared use path, buffered bicycle lane, widen sidewalk, crosswalks $852 $5,110 $33,213 $39,175 $1,371 $1,371 $38,323
Prosperity Farms from 800' N of Northlake Blvd to Donald Ross Rd LI-21-2 4498471 Complete Streets - Bicycle Lanes $7,700 $7,700 $5 $5,975 $5,980
Quadrille Blvd Complete Street from Okeechobee Blvd to N Dixie Hwy WPB0044 Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience $65 $389 $2,530 $2,984 $86 $86 $2,919
Shenondoah Rd Complete Street from Military Trl to Village Blvd WPB0053 Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience $50 $298 $1,934 $2,281 $99 $99 $2,232
South East Coast St and S. H Street LI-20-3 4483541 Complete Streets - Traffic operations, bicycle lanes $7,889 $7,889 $5 $7,884 $7,889
Spruce Ave from 36th St to 40th St TA-23-3 TBD Complete Streets - Bicycle lanes, sidewalks, ADA, crosswalks, safety, lighting $5 $1,578 $1,583
SR 7 Complete Street from PBC Line to SR 80 (Southern Blvd) FDOT0125 Complete Streets - Corridor study $300 $300 $399 $399
SR 7 from Glades Rd to Bridgebrook Dr MP-21-4 4476701 Complete Streets - Resurfacing, bicycle lanes $11,749 $11,749 $11,749 $11,749
SR 715 from Hatcher Rd to Paul Rardin Park, SR 715 from Airport Rd to SW 14th St MP-20-5 4479451 Complete Streets - Sidewalk $2,030 $2,030 $378 $378 $2,030
Summit Blvd Complete Street from Jog Rd to Parker Ave WPB0048 Complete Streets - Corridor study $658 $3,945 $25,645 $30,248 $1,059 $1,059 $29,590
SW 10th Ave Complete Street from Linton Blvd to SW 10th St DEL0007 Complete Streets - Corridor study $34 $205 $1,333 $1,572 $55 $55 $1,538
SW 18th St from Military Trl to Addison Ave TA-22-5 TBD Complete Streets - Shared use path, sidewalks, crosswalks $1,565 $1,565
Temple Blvd, Hall Blvd, 140th Ave Speed Tables LI-22-7 4507951 Complete Streets - Seminole Speed Tables $627 $627 $5 $526 $531
US 1 Complete Street from 59th St to Northlake Blvd 2045-TPA021.B 4383862 Complete Streets - Reconstruct as 4 lanes with multimodal improvements $2,307 $12,380 $12,380
US 1 from Camino Real Rd to NE 8th St/Mizner Blvd 2045-TPA022.B 4383865 Complete Streets - Lane repurposing from 6L to 4L & associated multimodal improvements. $814 $7,143 $7,143
US 1 from Northlake Blvd to Parker Bridge in North Palm Beach MP-17-1f 4383867 Complete Streets - Lane repurposing from 6L to 4L with shared-use paths, bicycle lanes, landscaping and furnishing zone $8,672 $8,672 $920 $11,534 $12,454
US 1 from Universe Blvd to Indiantown Road MP-23-1 TBD Complete Street: Multimodal Accommodation $10,700 $10,700 $14,231 $14,231
US 1 Lane Repurpising from Dixie/Federal Junction to Gregory Rd in Lake Worth Beach MP-17-1g TBD Complete Streets - Lane Repurposing from 4L to 3L; associated multimodal facilities $5,674 $5,674 $7,546 $7,546
US 1 Reconstruction from 25th St to 45th St in West Palm Beach MP-17-1d 4383866 Complete Streets - Reconstruct roadway to include pedestrian and bicycle facilities and safety $15,592 $15,592 $358 $300 $20,737 $21,395
Various Locations - Local Roads TA-22-4 4508241 Complete Streets - Install pedestrian and bicycle network wayfinding signage $874 $874
Various Locations - Residential Roads LI-20-6 4483051 Complete Streets - Construct ADA Improvements - Sidewalks and Curb Ramps $671 $671 $5 $666 $671
Village Blvd Complete Street from Palm Beach Lakes Blvd to 45th St WPB0002 Complete Streets - Complete Street: Multimodal Accommodation $270 $1,619 $10,522 $12,410 $359 $359 $12,141
Wellington Trace from east of Draft Horse Ln to Greenview Shores Blvd LI-23-7 TBD Complete Streets - Complete Street: Multimodal Accommodation $2,988 $2,988 $3,974 $3,974
El Rio Trail from Glades Rd to Yamato Rd TA-21-2 4489991 Safety - Lighting $1,269 $1,269
Southern Blvd (SR 80) from SR 15 to CR 880 MP-18-2 4417562 Lighting - Lighting $27,927 $27,927 $16,331 $496 $11,100 $11,596
A1A (N Ocean Dr) Resilient Reconstruction from Pine Roint Rd to John D MacArthur State Park RB0002 Resilience - Elevate roadway, bicycle lanes, sidewalks, ADA $889 $5,332 $34,656 $40,876 $1,182 $1,182 $39,988
Atlantic Ave (SR 806) Lane Addition from Cumberland Dr to Jog Rd 2045-TPA002.D 4405755 Road Capacity - Lane Addition: 4L to 6L $2,451 $94 $16,638 $23,936 $40,668
Atlantic Ave (SR 806) Lane Addition from SR 7 to Lyons Rd 2045-TPA001 2296584 Road Capacity - Lane Addition: 2L to 4L $4,313 $5,000 $21,564 $30,877 $40,412 $.363 $3,074 $140 $3,215
Atlantic Ave (SR 806) Lane Addition from Turnpike to Cumberland Rd 2045-TPA002.C 4405754 Road Capacity - Lane Addition: 4L to 6L $1,691 $12,000 $45,000 $58,691 $1,854 $6 $11,494 $39,989 $51,489
Flavor Pict Rd road extension from Lyons Rd to Hagen Ranch Rd PAL0097 2023500 Road Capacity - Extention, includes new bridge over Florida's Turnpike $15,525 $15,525 $15,525
Hooker Hwy (SR 812) from SR 715 to US 441 2045-TPA012 TBD Road Capacity - Lane Addition: 2L to 4L $661 $2,643 $3,964 $13,213 $20,480 $879 $3,515 $5,272 $26,425 $36,090
Indiantown Rd (SR 706) Intersection Improvements at Central Blvd MP-21-6 4499351 Road Capacity - PD&E Congestion management - Displaced Left Turn $1,010 $1,010 $1,010 $1,010
N Dixie Hwy Complete Street from Okeechobee to Banyan Blvd WPB0010 Road Capacity - Corridor Study $113 $677 $4,400 $5,190 $182 $182 $5,077
SR 7 Lane Addition from Okeechobee Blvd to 60th St 2045-TPA013 2296647 Road Capacity - Lane Addition: 2L to 4L $477 $43,416 $43,416
SR 7 Road Extension from 60th St to Northlake Blvd FDOT0016 2296643, 2296645, 2296646 Road Capacity - Road construction, side path, intersections $93,989 $93,989 $8,563 $85,638 $85,638
SR 80 Bypass/US 27 Connector from SR 80/US 27 to SR 715 FDOT0083 4417571 Road Capacity - Extension/Bypass $2,750 $4,313 $5,000 $38,605 $50,668 $2,750 $2,750 $47,918
Boca Raton Traffic Signals LI-23-3 TBD Signals - TSMO $2,683 $2,683 $3,568 $3,568
Boca Traffic Signal Improvements at Various Locations BOC0053 Signals - Traffic Signal $191 $1,243 $1,435 $308 $2,002 $2,310
Congress Ave (PalmTran - Route 2) - TSMO Improvements PAL0185 Signals - Traffic Signals, TSMO $6,210 $40,365 $46,575 $9,998 $80,730 $90,728
Forest Hill Blvd (PalmTran - Route 46) - TSMO Improvements PAL0200 Signals - TSMO $2,250 $14,625 $16,875 $3,623 $29,250 $32,873
Forest Hill Blvd (SR 882) Safety and Transt Improvements from W of Jog Rd to Military Trl MP-21-1 4498771 Signals - Lighting, transit operations, crosswalks, bicycle lanes, intersections $2,616 $2,616 $670 $1,946 $2,616
Glades Rd (SR 808) at Town Center Blvd; I 95 NB off ramp at W Palmetto Park Rd; I 95 SB off ramp at Palmetto Park Rd; US-1 at Royal Palm Way; US-1 at Hidden Valley Blvd MP-20-3.A 4480641 Signals - Traffic signal hardening $479 $2,847 $3,326 $479 $2,847 $3,326
Lake Worth Rd (PalmTran - Route 62) - TSMO Improvements PAL0207 Signals - Traffic Signals, TSMO $3,420 $22,230 $25,650 $4,549 $44,460 $49,009
Lake Worth Rd (SR 802) ITS from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd MP-19-1a TBD Signals - TSMO $1,000 $1,000 $1,000 $1,000
Military Trl (SR 809) (PalmTran - Route 3) - TSMO Improvements PAL0186 Signals - Traffic Signals, TSMO $7,470 $48,555 $56,025 $12,027 $97,110 $109,137
Okeechobee Blvd (PalmTran - Route 40/43) - TSMO Improvements PAL0195 Signals - Traffic Signals, TSMO $4,950 $32,175 $37,125 $6,584 $51,802 $58,385
PalmTran - Route 94 - TSMO Improvements PAL0221 Signals - Traffic Signals, TSMO $1,530 $9,945 $11,475 $2,463 $19,890 $22,353
SR A1A at Spanish River Blvd and Camino Real (include w/ FM 4476611); US-1 at Jeffery St, NE 32nd St, NE 20th St, Fire Station #1, NE Mizner Blvd, SE Mizner Blvd, and Camino Real; Yamato Rd at NW 2nd Ave (include w/ FM 447657.1); Glades Rd at NW 2nd Ave and Pinehurst Ln; I 95 NB Ramp at Peninsula Corp Dr; I 95 SB Ramp at Peninsula Corp Dr MP-21-3 4498751 Signals - Traffic Signal Modification $5,090 $5,090 $820 $6,770 $7,590
Toney Penna Dr Complete Street from Military Trl to Central Blvd JPT0001 Signals - Intersection, buffered bicycle lane, crosswalks $500 $300 $6,347 $7,147 $565 $399 $8,442 $9,406
Traffic Signal resilience improvements: Atlantic Ave @ Military Trl; Belvedere @ Military Trl; Forest Hill Blvd @ I 95 MP-20-2-4.A 4479441 Signals - Traffic signal hardening $166 $1,491 $1,657 $166 $1,491 $1,657
Traffic Signal Upgrades LI-23-6 TBD Signals - Traffic Signals $6,813 $6,813 $9,061 $9,061
Traffic Signal Upgrades MP-23-3 TBD Signals - Traffic Signals $4,109 $4,109 $5,465 $5,465
Traffic Signals - Flashing Yellow Arrows LI-23-8 TBD Signals - Traffic Signals $4,693 $4,693 $6,242 $6,242
Traffic Signals - Flashing Yellow Arrows MP-23-2 TBD Signals - Traffic Signals $2,103 $2,103 $2,797 $2,797
US 1 (PalmTran - Route 1) - ITS/TSMO Improvements PAL0184 Signals - Traffic Signals, TSMO $1,143 $7,430 $8,573 $1,520 $11,961 $13,482
US 1 at Glades Rd, NE 15th Ter, and NE 24th Ter MP-20-3.B 4481351 Signals - Replace span wire traffic signals with mast arms and upgrade supporting infrastructure $354 $2,147 $2,501 $354 $2,147 $2,501
US 1 at SE 1st St, 7th Ave N, 10th Ave N, 13th Ave N; Boynton Beach Blvd at US-1, Congress Ave, Seacrest Blvd, Miltary Trl, Hagen Ranch Rd; Congress Ave at Dolan Rd; Atlantic Ave at Hamlet Dr; Lake Ave at SR A1A (include w/ FM 4476631) MP-20-2-4.C 4481071 Signals - Traffic Signal Modification $637 $5,725 $6,362 $637 $5,725 $6,362
US 1 at Silver Beach Rd, Military at Investment Ln, Okeechobee at Quadrille Blvd, Lakeview Ave at Quadrille Blvd MP-20-2-4.B 4480731 Signals - Traffic Signal Modification $287 $2,769 $3,056 $308 $2,769 $3,077
FEC Railway Passenger Service from Broward County Line to Jupiter TPA0001 4170317 Transit - Commuter rail passenger service $13,407 $80,442 $446,900 $540,749 $40,500 $1,350 $1,350 $527,342
Okeechobee Blvd (SR 704) (PalmTran - Routes 40/43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd MP-18-1c 4513801 Transit - Corridor study $2,000 $2,000 $2,000 $2,000
Okeechobee Blvd (SR 704) (PalmTran - Routes 43) Transit Shelters from SR 7 to US-1; SR 7 Transit Shelters from Forest Hill Blvd to Okeechobee Blvd MP-18-1b 4417584 Transit - Shelters $900 $5,000 $5,900 $900 $5,000 $5,900
PalmTran Countywide Bus Stop Improvements LI-22-6 4507971 Transit - Bus Stops $5,000 $5,000 $5,000 $5,000
PalmTran Electric Buses and PalmTran Maintenance Facility (Electronics Way) charging stations LI-22-4 4507981 Transit - Purchase 4 electric buses and install electric charging at maintenance facility $5,000 $5,000 $5,000 $5,000
Tri-Rail - Passenger Rail Cars LI-20-2 4481031 Transit - Purchase passenger rail cars $15,000 $15,000 $15,000 $15,000
Tri-Rail - Passenger Rail Cars LI-23-5 TBD Transit - Rail Rolling Stock $5,000 $5,000 $5,000 $5,000
Tri-Rail on CSX/SFRC from Mangonia Park Station (45th St) to VA Hospital (Blue Heron Blvd) SFRTA0008 Transit - Commuter Rail $2,000 $111,000 $113,000 $4,937 $2,660 $2,660 $111,000
US 1 (PalmTran - Route 1) - Enhanced transit shelters from Palmetto Park Rd to Northlake Blvd MP-17-1b 4464431 Transit - Construct 14 enhanced transit shelters within existing ROW. $7,430 $7,430 $1,513 $5,917 $7,430
Beeline Hwy (SR 710) Lane Addition from Blue Heron Blvd to Northlake Blvd 2045-SIS002 4192511 Road Capacity - Lane Addition: 4L to 6L $2,022 $1,445 $119,775 $123,242 $178,346 $1 $4 $2,710 $2,715
I 95 Interchange Modification @ 10th Ave North 2045-SIS003 4127331 Road Capacity - Interchange Reconstruction: Diverging Diamond $2,650 $6,246 $23,142 $32,038 $2,474 $539 $1,000 $11,514 $13,053
I 95 Interchange Modification @ 45th St 2045-SIS004 4365191 Road Capacity - Interchange Reconstruction: Tight Diamond $44 $2,488 $2,532 $4,584 $44 $1,837 $21,779 $23,660
I 95 Interchange Modification @ 6th Ave South 2045-SIS005 4369631 Road Capacity - Interchange Reconstruction: Lane Addition $5,761 $11,251 $17,012 $29,424 $71 $360 $431
I 95 Interchange Modification @ Belvedere Rd FDOT0099 4427841 Road Capacity - Interchange Modification $3,630 $6,348 $40,726 $50,704 $4,828 $8,443 $65,569 $78,840
I 95 Interchange Modification @ Boynton Beach Blvd FDOT0133 4358041 Road Capacity - Interchange Modification
I 95 Interchange Modification @ Central Blvd 2045-SIS008 4132651 Road Capacity - Interchange Reconstruction: Tight Diamond $4,475 $9,081 $63,038 $76,594 $10,821 $6 $5,049 $116,403 $121,458
I 95 Interchange Modification @ Gateway Blvd 2045-SIS009 2319321 Road Capacity - Interchange Reconstruction: Single Point $6,946 $4,000 $112,143 $19,132 $15,550 $194 $13,786 $126,860 $140,840
I 95 Interchange Modification @ Hypoluxo Rd 2045-SIS010 4132571 Road Capacity - Interchange Reconstruction: Diverging Diamond $8,448 $66 $3,863 $102,997 $106,926
I 95 Interchange Modification @ Lantana Rd 2045-SIS012 4132581 Road Capacity - Interchange Reconstruction: Diverging Diamond $51 $14,134 $61,279 $75,464 $51 $14,134 $61,279 $75,464
I 95 Interchange Modification @ Linton Blvd 2045-SIS013 4353841 Road Capacity - Interchange Modification: Auxiliary Lanes $3,410 $1,248 $65 $1,313
I 95 Interchange Modification @ Linton Blvd 2045-SIS014 4353842 Road Capacity - Interchange Reconstruction: Diverging Diamond $618 $17,669 $18,287 $618 $26,103 $26,721
I 95 Interchange Modification @ Northlake Blvd 2045-SIS015 4358031 Road Capacity - Interchange Modification: Turn Lane Additions $6,731 $39 $3,966 $63,470 $67,475
I 95 Interchange Modification @ Palm Beach Lakes Blvd 2045-SIS017 4132601 Road Capacity - Interchange Modification: Turn Lane Additions $2,068 $153 $91 $244
I 95 Interchange Modification @ Southern Blvd (SR 80) 2045-SIS019 4355161 Road Capacity - Interchange Resonstruction $8,993 $8,403 $17,396
I 95 Interchange Modification @ Woolbright Rd 2045-SIS020 4372791 Road Capacity - Interchange Modification: Turn Lane Additions $3,909 $109 $241 $26,815 $27,165
I 95 Managed Lanes from 6th Ave S to North of Okeechobee Blvd FDOT0100 4442022 Road Capacity - Lane Addition: 4L Managed $253 $83,956 $2,484 $941,988 $1,028,681 $3,519 $253 $135,169 $4,968 $1,883,976 $2,024,367
I 95 Managed Lanes from Indiantown Rd to Martin County Line FDOT0101 4132522 Road Capacity - Lane Addition: 6L to 8L with Managed Lanes $749 $4,412 $49,501 $54,663 $550 $749 $4,412 $5,161 $49,501
I 95 Managed Lanes from Okeechobee Blvd to South of Indiantown Rd FDOT0102 4442023 Road Capacity - Lane Addition: 4L Managed $3,000 $36,225 $406,449 $445,674 $3,000 $36,225 $39,225 $406,449
I 95 Managed Lanes from South of Linton Blvd to 6th Ave S FDOT0103 4442021 Road Capacity - Lane Addition: 4 Managed $1,047 $33,646 $377,508 $412,201 $1,047 $54,170 $755,016 $810,233
Indiantown Rd (SR 706) WB Auxiliary Lane at Central Blvd FDOT0134 454564 Add WB auxiliary lane $600 $4,105 $4,705 $600 $4,105 $4,705
Southern Blvd (SR 80) Highway Capacity from West of Royal Palm Beach Blvd to I 95 FDOT0106 4451991 Highway Capacity - Multimodal $3,000 $162,000 $98,677 $1,817,642 $2,081,319 $6,000 $6,000 $2,078,319
Southern Blvd (SR 80) Intersection Improvements @ Jog Rd 2045-SIS039 4512241 Road Capacity - Interchange Modification: Lane Addition - Left Turn Lane $38 $10 $2,315 $2,362 $491 $38 $10 $2,315 $2,362
Southern Blvd (SR 80) Intersection Improvements @ SR 7 2045-SIS028 4378681 Road Capacity - Interchange Modification: Lane Addition - Turn Lanes $5 $408 $9,555 $9,968 $1,507 $5 $408 $9,576 $9,989
Southern Blvd (SR 80) Highway Capacity from West of Binks Forest Drive to West of Royal Palm Beach Blvd FDOT0104 4427831 Highway Capacity - Multimodal (potentially widen 6L to 8L) $1,500 $2,587 $37,377 $29,021 $70,485 $2,415 $5,173 $37,377 $44,965 $29,021
Turnpike Interchange Consruction @ Hypoluxo Rd TPKE0015 4397411 Road Capacity - New Interchange $2,000 $2,000 $2,000 $2,000 $2,000
Turnpike Lane Addition from Beeline Hwy to PGA Blvd TPKE0009 4157481 Road Capacity - Lane Addition: 4L to 8L, includes Beeline Hwy and PGA Blvd interchanges $5,232 $224,115 $229,347 $600 $5,232 $224,115 $229,947
Turnpike Lane Addition from Broward County Line to North of Glades Rd TPKE0001 4182145 Road Capacity - Lane Addition and TSM&O: Auxiliary Lanes $97,042 $97,042 $151,814 $151,814
Turnpike Lane Addition from North of Atlantic Ave to North of L-30 Canal TPKE0004 4371691 Road Capacity - Lane Addition: 6L to 10 L w/ Thru Lanes $2,747 $7,355 $104,140 $114,242 $9,965 $2,747 $7,355 $138,506 $148,608
Turnpike Lane Addition from North of Boynton Beach Blvd to Southern Blvd TPKE0006 4061435 Road Capacity - Lane Addition: 4L to 6L $280,995 $280,995 $306,917 $4,300 $4,300
Turnpike Lane Addition from North of Glades Rd to North of L-38 Canal TPKE0002 4171321 Road Capacity - Lane Addition: 6L to 10L w/ Thru Lanes $574 $272,932 $273,506 $8,000 $574 $250,364 $258,938
Turnpike Lane Addition from North of L-30 Canal to North of Boynton Beach Blvd TPKE0005 4371694 Road Capacity - Lane Addition: 6L to 10L w/ Thru Lanes, includes Boynton Beach Blvd interchange $2,977 $105,312 $108,289 $2,977 $140,065 $143,042
Turnpike Lane Addition from North of L-38 Canal to North of Atlantic Ave TPKE0003 4171324 Road Capacity - Lane Addition: 6L to 10 L w/ Thru Lanes, includes Atlantic Ave interchange $4,650 $129,701 $134,351 $4,650 $129,701 $134,351
Turnpike Lane Addition from North of Okeechobee Blvd to Beeline Hwy TPKE0008 4061436 Road Capacity - Lane Addition: 4L to 8L $134,452 $134,452 $10,162 $600 $134,452 $135,052
Turnpike Lane Addition from Indiantown Rd to Martin County Line TPKE0013 4462181 Road Capacity - Lane Addition: 4L to 6L $2,007 $2,007 $2,007 $2,007 $2,007
Turnpike Lane Addition from Southern Blvd to Okeechobee Blvd TPKE0007 4061438 Road Capacity - Lane Addition: 4L to 8L , includes Jog Rd and Okeechobee Blvd interchanges $263,712 $263,712 $438 $263,712 $263,712
Turnpike Lane Addition from North of PGA Blvd to North of Indiantown Rd TPKE0010 4157484 Road Capacity - Lane Addition: 4L to 8 L, includes Indiantown Rd interchange $500 $350,729 $351,229 $500 $466,470 $466,970
US 27 Freight Capacity from Broward County Line to Evercane Rd (Hendry County) 2045-SIS034 Freight - Capacity $2,000 $39,341 $16,189 $413,075 $470,606 $2,000 $2,000 $468,606
Beeline Hwy (SR 710) ITS from Blue Heron Blvd to Congress Ave 2045-SIS001 TBD Signals - Intersection & TSMO Improvements $1,295 $13,014 $14,309 $1,722 $20,953 $22,675
Beeline Hwy (SR 710) ITS from Congress Ave to Martin County Line SIS0004 Signals - TSMO $2,300 $2,300 $4,600 $4,600
Southern Blvd (SR 80) ITS from US 27 to I 95 FDOT0105 4480121 Intelligent Transportation System - Corridor Management $1,576 $17,687 $19,263 $1,576 $37,107 $38,683
US 27 ITS from Broward County Line to South of SW 2nd St (South Bay) FDOT0107 4462341 ITS retrofit $819 $9,456 $10,274 $820 $19,838 $20,658
US 27 ITS from Krome Ave (Miami-Dade County) to Evercane Rd (Hendry County) FDOT0108 ITS Corridor Management - TSMO $2,217 $25,612 $27,829 $2,217 $53,733 $55,950
A1A SUN Trail from Camino Real to Beach Club Way SUN-2023.B TBD Complete Streets - Feasibility Study, design, pedestrian Bridge $3,000 $3,000 $3,000
Boca Brightline Station Area Pedestrian and Bicycle Acccess Improvements BOC0007 Complete Streets - Area Study $268 $1,608 $10,454 $12,331 $12,331
Boca Street Light Design BOC0047 Complete Streets - Lighting $19 $112 $730 $861 $861
C-8 Canal Trail from Stribling Way to Lake Worth Rd WEL0001 Complete Streets - Shared use path $790 $790 $790
Central Blvd Complete Street from 117th Ct N to Donald Ross Rd PBG0017 Complete Streets - Sidewalk widening. The City is also supportive of a 8’ pathway on the W side of the road, in addition to the East side already noted.
Clear Lake Path Extension from current boardwalk to Banyan Blvd WPB0057 Complete Streets - Shared use path
Delray Downtown Bicycle Boulevards DEL0002 Complete Streets - Bicycle Route, sharrows, bicycle boulevard
Downtown Walkability Study Implementation BOC0027 Complete Streets - Area study $1,404 $8,423 $54,751 $64,579 $64,579
El Rio Trail South Extension BOC0020 Complete Streets - Shared use path
M Canal Trail from Jog Rd to downtown West Palm Beach ROY0003 Complete Streets - Shared use path
Old Dixie Hwy from NE 5th Ave to City of Boynton Beach DEL0005 Complete Streets - Complete Streets Study $10,000 $10,000 $10,000
RCA Blvd Complete Street & Intersection from Design Center Dr to Prosperity Farms Rd PBG0005 Complete Streets - Road capacity, median, roundabout, turn lanes, side paths, trails, bicycle lanes. The City would like to include a roundabout to the scope of this project or as a separate project. $118 $708 $4,600 $5,426 $5,426
South Shore Blvd Trail from Lake Worth Rd to 50th Street WEL0002 Complete Streets - Shared use path $990 $990 $990
SUN Trail along SR 80 TPA0013 Complete Streets - Shared use path
SUN Trail North- South along Atlantic Coast TPA0012 Complete Streets - Shared use path
Tamarind Ave from Banyan Blvd to N Sapodilla Rail to Trail WPB0006 Complete Streets - Shared use path $270 $270 $270
West Palm Beach Greenway Project South WPB0047 Complete Streets - Shared use path $5,000 $5,000 $5,000
US 1 SUN Trail from Indiantown Rd to Loxahatchee River SUN-2023.A TBD Complete Streets - Shared use path $7,147 $7,147 $7,147
Boca Brightline Station Pedestrian Overpass to Mizner Park BOC0003 Grade Separation - Grade Separation: Ped/Bike $285 $1,710 $11,115 $13,110 $13,110
El Rio Trail Bridge between Glades Road and 20th Street BOC0041 Grade Separation - Grade separated pedestrian bridge
El Rio Trail Grade Separation at Spanish River Boulevard BOC0001 Grade Separation - Grade separated pedestrian bridge $150 $900 $5,850 $6,900 $6,900
I 95 Pedestrian Bridge connecting NW 13th St and the Shops at Boca Center BOC0021 Grade Separation - Grade Separation: Ped/Bike
Tri-Rail Boca Raton Station - Electric Vehicle Charging SFRTA0014 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Boynton Beach Station - Electric Vehicle Charging SFRTA0012 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Delray Beach Station - Electric Vehicle Charging SFRTA0013 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Lake Worth Beach Station - Electric Vehicle Charging SFRTA0011 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Mangonia Park Station - Electric Vehicle Charging SFRTA0009 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail West Palm Beach Station - Electric Vehicle Charging SFRTA0010 Resilience - EV Charging Stations $945 $945 $945
120th Ave @ Lake Worth Road roundabout WEL0003 "Road Capacity - Construct a 2x1 Roundabout " $3,000 $3,000 $3,000
Fern St Road Extension from Australian Ave to Tamarind Ave WPB0005 Complete Streets - Street extension, new RR crosswalks, separated bicycle lanes, trail crosswalks $6,262 $37,573 $244,227 $288,063 $288,063
Government Center Roads from PGA Blvd to Fairchild Avenue road construction PBG0004 Road Capacity - 2L Road, sidewalks, bicycle lanes
Greenview Shores Blvd Corridor Roundabouts (@ Paddock Drive, Foresteria Ave, & Meadow Ave) WEL0012 Road Capacity - Corridor intersection analysis, roundabouts
Indiantown Rd (SR 706) PD&E Study from Central Blvd to Maplewood Dr JPT0004 Road Capacity - PDE to relieve congestion
Jeffery St Road Extension from 2nd Ave to Federal Hwy BOC0013 Road Capacity - 2L Road, RR crossing $52 $314 $1,742 $2,108 $2,108
10th Ave N ITS from Kirk Rd to I 95 FDOT0109 Signals - TSMO $437 $2,840 $3,277 $3,277
45th St ITS from N Congress Ave to Greenwood Ave FDOT0110 Signals - TSMO $318 $2,068 $2,386 $2,386

TPA Priorities — Illustrative Projects

All costs in thousands of dollars. 92 projects listed.

TPA Priorities — Illustrative Projects: Project costs by funding phase (FY 2024–2050), in thousands of dollars
Project Information Present Day Costs FY24 (in thousands) Previous FY 25–29 FY 30–35 FY 36–40 FY 41–50 CF Total Unfunded
Project Name LRTP # FM # Description PDE PE ROW CST Total O&M PDEPEROWCST PDEPEROWCST PDEPEROWCST PDEPEROWCST
Atlantic Ave (PalmTran - Route 81) - TSMO Improvements PAL0216 Signals - Traffic signals, TSMO $2,970 $19,305 $22,275 $22,275
Atlantic Ave (SR 806) ITS from Congress Ave to Swinton Ave FDOT0111 Signals - Traffic Signals, TSMO $232 $1,508 $1,741 $1,741
Banyan Blvd ITS from Australian Ave to N Flagler Dr FDOT0112 Signals - TSMO $182 $1,186 $1,369 $1,369
Blue Heron Blvd (SR 708) ITS from Military Trail to Old Dixie Hwy FDOT0113 Signals - Traffic Signals, TSMO $457 $2,971 $3,428 $3,428
Boca TMC Adaptive Traffic Control Upgrade BOC0056 Signals - Facilities Development, TSMO $54 $327 $2,123 $2,504 $2,504
Boynton Beach Blvd (PalmTran - Route 73) - TSMO Improvements PAL0213 Signals - Traffic Signals, TSMO $2,610 $16,965 $19,575 $19,575
Congress Ave (SR 807) Congress Ave ITS from Southern Blvd to Yamato Rd FDOT0114 Signals - Traffic Signals, TSMO $3,616 $23,506 $27,122 $27,122
Dixie Hwy (SR 811) ITS from Yamato Rd to Royal Palm Way FDOT0115 Signals - Traffic Signals, TSMO $815 $5,297 $6,112 $6,112
Lake Worth Rd (SR 802) Lake Worth Rd ITS from SR 7 to I 95 FDOT0117 Signals - Traffic Signals, TSMO $1,561 $10,147 $11,708 $11,708
Lantana Rd ITS from High Ridge Rd to I 95 FDOT0118 Signals - TSMO $72 $471 $543 $543
Military Trl (SR 809) ITS from Lake Worth Rd to Atlantic Ave FDOT0119 Signals - Traffic Signals, TSMO $2,026 $13,167 $15,192 $15,192
Military Trl (SR 809) ITS from Lake Worth Rd to Hypoluxo Rd FDOT0120 Signals - Traffic Signals, TSMO $577 $3,754 $4,331 $4,331
Military Trl (SR 809) ITS from Yamato Rd to Town Center Cir FDOT0121 Signals - Traffic Signals, TSMO $412 $2,677 $3,089 $3,089
Okeechobee Blvd (PalmTran - Route 43) - ITS/TSMO Improvements PLMT0119 Signals - TSMO $315 $2,048 $2,363 $2,363
PalmTran - Route 81 - TSMO Improvements PLMT0138 Signals - TSMO $297 $1,931 $2,228 $3,861 $3,861 $297
PGA Blvd (SR 876) ITS from FL Turnpike to Central Blvd FDOT0124 Signals - Traffic Signals, TSMO $300 $300 $300
Signals FDOT0116 Signals - Traffic Signals, TSMO $726 $4,721 $5,447 $5,447
US 1 ITS from Lake Ave to N Federal Hwy FDOT0122 Signals - Traffic Signals, TSMO $763 $4,960 $5,723 $5,723
US 1 ITS from Northlake Blvd to N Quadrille Blvd and from Southern Blvd to Lucerne Ave FDOT0123 Signals - Traffic Signals, TSMO $2,032 $13,208 $15,240 $15,240
Atlantic Ave (PalmTran - Route 81) - Enhanced Transit from Military Trl to US 1 TPA0010 Transit - Fixed Guideway $3,885 $15,860 $85,988 $105,733 $105,733
Atlantic Ave (PalmTran - Route 81) - Weekday service frequency PLMT0068 Transit - Capital to support enhanced service $1,332 $5,438 $29,482 $36,251 $967 $36,251
Boca Raton - Trolleys BOC0049 Transit - Rolling Stock
Boynton Beach Blvd (PalmTran - Route 73) - Bus Stop Improvements PLMT0176 Transit - Transit Stops $60 $359 $2,331 $2,750 $2,750
Boynton Beach Blvd (PalmTran - Route 73) - Enhanced Transit from Military Trl to US 1 TPA0009 Transit - Fixed Guideway $984 $4,017 $21,779 $26,780 $26,780
Boynton Beach Blvd (PalmTran - Route 73) - Weekday service frequency PLMT0062 Transit - Capital to support enhanced service $295 $1,205 $6,534 $8,034 $1,179 $8,034
Congress Ave (PalmTran - Route 2) - Bus Stop Improvements PLMT0148 Transit - Bus Stops $17 $101 $658 $776 $776
Congress Ave (PalmTran - Route 2) - Weekday service frequency PLMT0004 Transit - Capital to support enhanced service $882 $3,601 $19,522 $24,004 $3,800 $24,004
Congress Ave (PalmTran - Route 2) Enhanced Transit Vision from Yamato Rd to Intermodal Center TPA0004 Transit - Fixed Guideway $5,880 $24,004 $130,144 $160,028 $160,028
FEC Palm Beach Gardens Passenger Rail Station PBG0003 Transit - Passenger Rail Station $1,000 $1,000 $4,000 $14,965 $20,965 $20,965
FEC Railway Crossing Safety Improvements FDOT0132 Transit - 44 RR Crossings
Forest Hill Blvd (PalmTran - Route 46) - Bus Stop Improvements PLMT0163 Transit - Bus Stops $667 $4,000 $26,003 $30,670 $30,670
Forest Hill Blvd (PalmTran - Route 46) - Weekday service frequency PLMT0039 Transit - Capital to support enhanced service $900 $3,674 $19,920 $24,494 $1,613 $24,494
Forest Hill Blvd (PalmTran - Route 46) Enhanced Transit from SR 7 to US 1 TPA0007 Transit - Fixed Guideway $2,625 $10,716 $58,100 $71,441 $71,441
Glades Rd - Route 92 - Weekday service frequency PLMT0077 Transit - Capital to support enhanced service $670 $2,734 $14,820 $18,224 $1,309 $18,224
Glades Rd (PalmTran - Route 91) Enhanced Transit from Butts Rd to US 1 TPA0011 Transit - Fixed Guideway $2,232 $9,112 $49,401 $60,745 $60,745
Lake Worth Rd (PalmTran - Route 62) - Bus Stop Improvements PLMT0170 Transit - Bus Stops $812 $4,874 $31,682 $37,368 $37,368
Lake Worth Rd (PalmTran - Route 62) - Weekday service frequency PLMT0052 Transit - Capital to support enhanced service $400 $1,631 $8,844 $10,875 $1,527 $10,875
Lake Worth Rd Enhanced Transit from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd TPA0008 TBD Transit - Fixed Guideway $3,960 $23,760 $132,000 $159,720 $159,720
Military Trl (SR 809)(PalmTran - Route 3) - Bus Stop Improvements PLMT0149 Transit - Bus Stops $24 $143 $933 $1,100 $1,100
Military Trl (SR 809) (PalmTran - Route 3) - Enhanced Transit from Glades Rd to PGA Blvd TPA0005 Transit - Fixed Guideway $8,088 $33,018 $179,014 $220,120 $220,120
Militray Trl (PalmTran - Route 3) - Weekday service frequency PLMT0007 Transit - Capital to support enhanced service $2,426 $9,905 $53,704 $66,036 $5,333 $66,036
Okeechobee Blvd (PalmTran - Route 43) - Bus Stop Improvements PLMT0158 Transit - Bus Stops $720 $4,322 $28,095 $33,138 $33,138
Okeechobee Blvd (SR 704)(PalmTran - Routes 43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd TPA0006 See FDOT0070 Transit - Fixed Guideway $56,990 $341,938 $1,500,727 $1,899,655 $1,899,655
PalmTran - Route 43 - Weekday service frequency PLMT0032 Transit - Capital to support enhanced service $1,600 $1,600 $1,390 $1,600
PalmTran - Route 81 - Bus Stop Improvements PLMT0179 Transit - Bus Stops $713 $4,276 $27,796 $32,785 $32,785
PalmTran - Route 94 - Bus Stop Improvements PLMT0184 Transit - Bus Stops $284 $1,701 $11,059 $13,044 $13,044
PalmTran - Route x999x - Express Bus from Belle Glade to WPB via SR 80 PLMT0225 Transit - Capital to support enhanced service $5,600 $5,600 $1,711 $5,600
PalmTran - Route x999x - Express Bus from Broward County Line to Okeechobee Blvd via SR-7 PLMT0226 Transit - Capital to support enhanced service $5,600 $5,600 $1,553 $5,600
PalmTran - Route x999x - Express Bus from Westlake to WPB via Northlake Blvd PLMT0223 Transit - Capital to support enhanced service $3,200 $3,200 $939 $3,200
PalmTran - Route x999x - Express Bus from Westlake to WPB via Okeechobee Blvd PLMT0224 Transit - Capital to support enhanced service $3,200 $3,200 $756 $3,200
PalmTran Rolling Stock Coaches for Express Routes PLMT0104 Transit - Rolling Stock $15 $89 $580 $3,200 $685
PalmTran Rolling Stock Low Floor Buses PLMT0103 Transit - Rolling Stock $465 $2,791 $18,140 $100,000 $21,395
Patch Reef Trail from Verde Trail to Sugar Sand Park BOC0035 Transit - Shared use path
SFRC Fiber Communication SFRTA0001 Transit - Rail, Utilities $16,000 $16,000 $16,000
SFRC Grade Crossings and Signals - Signal Safety Improvements SFRTA0002 Transit - Rail, Utilities $17,000 $17,000 $17,000
SFRC System Control Points Replacement in Palm Beach County SFRTA0007 Transit - Rail, Control signals $24,000 $24,000 $24,000
SFRC Wood Tie Conversion to Concrete SFRTA0004 Transit - Rail, Maintenance $25,000 $25,000 $25,000
Tri-Rail New Automated Fare Collection System (AFCS) SFRTA0003 Transit - Regional Farebox System $12,000 $12,000 $12,000
Tri-Rail Positive Train Control (PTC) SFRTA0005 Transit - Rail Control System $20,000 $20,000 $20,000
Tri-Rail Rolling Stock Remaining Vehicle Replacement and Service Expansion SFRTA0006 Transit - Rail Rolling Stock $52,400 $52,400 $52,400
US 1 (PalmTran - Route 1) - Bus Stop Improvements PLMT0147 Transit - Bus Stops $29 $172 $1,118 $1,318 $1,318
US 1 (PalmTran - Route 1) Enhanced Transit from Camino Real to Indiantown Rd TPA0003 TBD Transit - Fixed Guideway $4,893 $29,358 $163,098 $197,349 $197,349
West Palm Beach Blue Trolley Route ITS/TSMO improvements WPB0065
West Palm Beach Blue Trolley Route Transit stop improvements WPB0064 Transit - Bus Stops
West Palm Beach Transit Fleet replacement WPB0046 Transit - Rolling Stock $420 $2,520 $16,380 $19,320 $19,320
Tri-Rail Boynton Beach Station - Electric Vehicle Charging SFRTA0012 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Delray Beach Station - Electric Vehicle Charging SFRTA0013 Resilience - EV Charging Stations $945 $945 $945
Tri-Rail Boca Raton Station - Electric Vehicle Charging SFRTA0014 Resilience - EV Charging Stations $945 $945 $945
US 1 SUN Trail from Indiantown Rd to Loxahatchee River SUN-2023.A TBD Complete Streets - Shared use path $7,147 $7,147 $7,147
A1A SUN Trail from Camino Real to Beach Club Way SUN-2023.B TBD Complete Streets - Feasibility Study, design, pedestrian Bridge $3,000 $3,000 $3,000
US 1 (PalmTran - Route 1) Enhanced Transit from Camino Real to Indiantown Rd TPA0003 TBD Transit - Fixed Guideway $4,893 $29,358 $163,098 $197,349 $197,349
Congress Ave (PalmTran - Route 2) Enhanced Transit Vision from Yamato Rd to Intermodal Center TPA0004 Transit - Fixed Guideway $5,880 $24,004 $130,144 $160,028 $160,028
Military Trl (SR 809) (PalmTran - Route 3) - Enhanced Transit from Glades Rd to PGA Blvd TPA0005 Transit - Fixed Guideway $8,088 $33,018 $179,014 $220,120 $220,120
Okeechobee Blvd (SR 704)(PalmTran - Routes 43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd TPA0006 See FDOT0070 Transit - Fixed Guideway $56,990 $341,938 $1,500,727 $1,899,655 $1,899,655
Forest Hill Blvd (PalmTran - Route 46) Enhanced Transit from SR 7 to US 1 TPA0007 Transit - Fixed Guideway $2,625 $10,716 $58,100 $71,441 $71,441
Lake Worth Rd Enhanced Transit from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd TPA0008 TBD Transit - Fixed Guideway $3,960 $23,760 $132,000 $159,720 $159,720
Boynton Beach Blvd (PalmTran - Route 73) - Enhanced Transit from Military Trl to US 1 TPA0009 Transit - Fixed Guideway $984 $4,017 $21,779 $26,780 $26,780
Atlantic Ave (PalmTran - Route 81) - Enhanced Transit from Military Trl to US 1 TPA0010 Transit - Fixed Guideway $3,885 $15,860 $85,988 $105,733 $105,733
Glades Rd (PalmTran - Route 91) Enhanced Transit from Butts Rd to US 1 TPA0011 Transit - Fixed Guideway $2,232 $9,112 $49,401 $60,745 $60,745
SUN Trail North- South along Atlantic Coast TPA0012 Complete Streets - Shared use path
SUN Trail along SR 80 TPA0013 Complete Streets - Shared use path
Okeechobee Gateway from West of Australian Ave to the ICWW TPA0014 Complete Streets - Corridor Study
C-8 Canal Trail from Stribling Way to Lake Worth Rd WEL0001 Complete Streets - Shared use path $790 $790 $790
South Shore Blvd Trail from Lake Worth Rd to 50th Street WEL0002 Complete Streets - Shared use path $990 $990 $990
Greenview Shores Blvd Corridor Roundabouts (@ Paddock Drive, Foresteria Ave, & Meadow Ave) WEL0012 Road Capacity - Corridor intersection analysis, roundabouts
Fern St Road Extension from Australian Ave to Tamarind Ave WPB0005 Complete Streets - Street extension, new RR crosswalks, separated bicycle lanes, trail crosswalks $6,262 $37,573 $244,227 $288,063 $288,063
Tamarind Ave from Banyan Blvd to N Sapodilla Rail to Trail WPB0006 Complete Streets - Shared use path $270 $270 $270
West Palm Beach Transit Fleet replacement WPB0046 Transit - Rolling Stock $420 $2,520 $16,380 $19,320 $19,320
West Palm Beach Greenway Project South WPB0047 Complete Streets - Shared use path $5,000 $5,000 $5,000
Clearlake Multipurpose Path WPB0057 Complete Streets - Shared use path
West Palm Beach Blue Trolley Route Transit stop improvements WPB0064 Transit - Bus Stops
West Palm Beach Blue Trolley Route ITS/TSMO improvements WPB0065

Maintenance Projects

All costs in thousands of dollars. 33 projects listed.

Maintenance Projects: Project costs by funding phase (FY 2024–2050), in thousands of dollars
Project Information Present Day Costs FY24 (in thousands) Previous FY 25–29 FY 30–35 FY 36–40 FY 41–50 CF Total Unfunded
Project Name LRTP # FM # Description PDE PE ROW CST Total O&M PDEPEROWCST PDEPEROWCST PDEPEROWCST PDEPEROWCST
Barwick Rd over LWDD L-30 Canal bridge repairs PAL0165 2022801 Bridge Reconstruction - Replace bridge $2,000 $2,000 $2,000
Belvedere Rd over LWDD E-3 Canal bridge repairs PAL0166 2018801 Bridge Reconstruction - Bridge Replacement, 5 L w/ buffered bike lanes & dedicated right turn lane. $3,000 $3,000 $3,000
Congress Ave over L-2 Canal bridge repairs PAL0167 2019802 Bridge Reconstruction - Replace bridge with culvert $1,500 $1,500 $1,500
Congress Ave over SFRTA Rail bridge repairs PAL0161 2021610 Bridge Reconstruction - Bridge repairs $500 $500 $500
Coral Drive over Subdivision Canal Bridge Replacement FDOT0001 Bridge Reconstruction - Bridge Reconstruction $800 $800 $800
CR 880 (Sam Senter Rd) over SFWMD Ocean Canal bridge repairs PAL0170 2019803 Bridge Reconstruction - Bridge Reconstruction $9,300 $9,300 $9,300
CR-707/Beach Road over ICWW Bridge Replacement FDOT0003 Bridge Reconstruction - Bridge Reconstruction (#930026) $59,600 $59,600 $59,600
CR-880 over C-51 Canal Bridge Replacement FDOT0004 Bridge Reconstruction - Bridge Reconstruction (#930940) $7,000 $7,000 $7,000
Duda Rd over L-14 Canal bridge repairs PAL0171 2023801 Bridge Reconstruction - Replace to a 3 span bridge $4,250 $4,250 $4,250
E Ocean Ave over Hypoluxo Island bridge repairs PAL0172 2023800 Bridge Reconstruction - Replace bridge $600 $600 $600
E. Camino Real over ICWW Bridge Replacement FDOT0005 Bridge Reconstruction - Bridge Reconstruction (#934408) $22,500 $22,500 $22,500
Florida Mango Rd over L-2 Canal bridge repairs PAL0173 2017512 Bridge Reconstruction - Replace existing Bridge with twin RCP pipes $817 $817 $817
Florida Mango Rd over L-5 Canal bridge replacement PAL0179 2015523 Bridge Reconstruction - Replace existing bridge with concrete box culvert $1,300 $1,300 $1,300
G Bush Blvd (NE 8th) over ICWW bridge replacement PAL0174 2022506 Bridge Reconstruction - Reconstruct existing bascule bridge $70,000 $70,000 $70,000
Jupiter Beach Rd over Branch of ICWW bridge replacement PAL0175 2021803 Bridge Reconstruction - Replace Bridge and reconstruct approaches $2,300 $2,300 $2,300
Kirk Rd over L-11 Canal culvert replacement PAL0183 2023502 Bridge Reconstruction - Replace existing 60" CMP culvert. $1,750 $1,750 $1,750
Lake Osborne Dr over Lake Bass Canal bridge replacement PAL0180 2017801 Bridge Reconstruction - IST project requested by R&B to replace existing Bridge. Project includes ILA with Municipal of Lake Worth for utility relocation $810 $810 $810
Lighthouse Dr over North Plam Beach Waterway Bridge Replacement FDOT0007 Bridge Reconstruction - Bridge Reconstruction (#934408) $4,500 $4,500 $4,500
Palm Beach Lakes Blvd over FEC Railroad bridge repairs PAL0163 2017800 Bridge Reconstruction - Widen and rehab bridge to add shoulders, barrier, & sidewalks $20,000 $20,000 $20,000
Palmetto Park Rd over ICWW bridge repairs PAL0162 2013607 Bridge Reconstruction - Bascule Bridge rehabilitation, painting and fender system repairs $4,200 $4,200 $4,200
Prosperity Farms Rd over C-17 Canal bridge replacement PAL0176 2018800 Bridge Reconstruction - Replace and widen existing bridge $8,400 $8,400 $8,400
Smith Sundy Rd over L-33 Canal bridge replacement PAL0177 2017514 Bridge Reconstruction - Replace bridge $2,100 $2,100 $2,100
Spanish River Blvd over ICWW Bridge Replacement (WB & EB) FDOT0013 Bridge Reconstruction - Bridge Reconstruction (#930154 & 930226) $91,800 $91,800 $91,800
SR 806 (Atlantic Ave) over ICWW Bridge Replacement FDOT0008 Bridge Reconstruction - Bridge Reconstruction (#930026) $32,800 $32,800 $32,800
SR 811 (Alt. A1A) over Loxahatchee River Bridge Replacement FDOT0009 Bridge Reconstruction - Bridge Reconstruction (#930339) $121,000 $121,000 $121,000
SR 876 (PGA Blvd) Bridge Replacement over ICWW FDOT0012 Bridge Reconstruction - Bridge Reconstruction (#930106 & 930349) $96,000 $96,000 $96,000
SR A1A over Boca Inlet Bridge Replacement FDOT0010 Bridge Reconstruction - Bridge Reconstruction (#930060) $55,500 $55,500 $55,500
Summit Blvd from west of C-51 Canal Crossing to I 95 lane addition PAL0042 Bridge Reconstruction - Replace bridge, add walls and railroad crossing improvement $3,105 $3,105 $3,105
Summit Blvd over C-51 bridge replacement PAL0178 2022803 Bridge Reconstruction - Replace bridge $11,000 $11,000 $11,000
Torry Island Swing Bridge repairs PAL0164 2020602 Bridge Reconstruction - Study to repair the aging bridge superstructure. $2,000 $2,000 $2,000
US 1 (Parker Blvd) over ICWW Bridge Replacement FDOT0011 Bridge Reconstruction - Bridge Reconstruction (#930004) $76,800 $76,800 $76,800
Woolbright Rd over ICWW Bridge Replacement FDOT0014 Bridge Reconstruction - Bridge Reconstruction (#930214) $42,600 $42,600 $42,600
Woolbright Rd over SE 15th Ave bascule bridge repairs PAL0181 2023501 Bridge Reconstruction - Bridge Reconstruction $200 $200 $200

Airports and Seaports Projects

All costs in thousands of dollars. 104 projects listed.

Airports and Seaports Projects: Project costs by funding phase (FY 2024–2050), in thousands of dollars
Project Information Present Day Costs FY24 (in thousands) Previous FY 25–29 FY 30–35 FY 36–40 FY 41–50 CF Total Unfunded
Project Name LRTP # FM # Description PDE PE ROW CST Total O&M PDEPEROWCST PDEPEROWCST PDEPEROWCST PDEPEROWCST
Lantana Airport - Storm drainage & pavement PORT0036 Airport - Install storm drainage and pavement to areas currently without, port wide $5,000 $5,000 $5,000 $5,000
Lantana Airport - Airfield Pavement Maintenance LNA0003 Airport - Airfield Pavement Maintenance $1,500 $1,500 $1,500 $1,500
Lantana Airport - Automated Weather Observing System (AWOS) Replacement LNA0001 Airport - Automated Weather Observing System (AWOS) Replacement $300 $300 $300 $300
Lantana Airport - Runway 16-34 Rehabilitation LNA0004 Airport - Lantana Airport - Runway 16-34 Rehabilitation $7,000 $7,000 $7,000 $7,000
Lantana Airport - Southside Redevelopment LNA0002 Airport - Southside Redevelopment $6,500 $6,500 $6,500 $6,500
North Palm Beach County Airport - Air Traffic Control Tower F450002 Airport - Air Traffic Control Tower $13,000 $13,000 $13,000 $13,000
North Palm Beach County Airport - Airport Pavement Maintenance & Rehabilitation F450006 Airport - Pavement Maintenance $4,000 $4,000 $4,000 $4,000
North Palm Beach County Airport - Apron Rehab/ Expansion F450004 Airport - Apron Rehab/ Expansion $5,500 $5,500 $5,500 $5,500
North Palm Beach County Airport - Automated Weather Observing System (AWOS) Replacement F450003 Airport - AWOS Replacement $300 $300 $300 $300
North Palm Beach County Airport - Runway 14-32 F450001 Airport - Beach County Airport - Runway 14-32 $32,000 $32,000 $32,000 $32,000
North Palm Beach County Airport - Runway 9R-27L F450005 Airport - Airport - Runway 9R-27L $1,000 $1,000 $1,000 $1,000
Palm Beach County Airports - Airfield Maintenance & Repairs DOA0001 Airport - Airfield Maintenance & Repairs $12,500 $12,500 $12,500 $12,500
Palm Beach County Airports - Capital Projects Permits & Fees DOA0004 Airport - Capital Projects Permits & Fees $2,000 $2,000 $2,000 $2,000
Palm Beach County Airports - Consultant Services DOA0002 Airport - Consultant Services $15,000 $15,000 $15,000 $15,000
Palm Beach County Airports - Terminal Improvements DOA0003 Airport - Terminal Improvements $5,000 $5,000 $5,000 $5,000
Palm Beach International Airport - Access Control System Replacement PBI0008 Airport - Access Control System Replacement $3,000 $3,000 $3,000 $3,000
Palm Beach International Airport - ADA Accessibility Improvements PBI0017 Airport - ADA Accessibility Improvements $3,000 $3,000 $3,000 $3,000
Palm Beach International Airport - Air Cargo Building 1475 Landside PCC Repairs PBI0021 Airport - Cargo Building Repairs $4,000 $4,000 $4,000 $4,000
Palm Beach International Airport - Air Handler Unit PBI0015 Airport - Air Handler Unit $4,654 $4,654 $4,654 $4,654
Palm Beach International Airport - Airfield Electrical Vault Improvements PBI0019 Airport - Airfield Electrical Vault Improvements $5,000 $5,000 $5,000 $5,000
Palm Beach International Airport - Airport Layout Plan & Narrative Report PBI0014 Airport - Layout Plan $250 $250 $250 $250
Palm Beach International Airport - ARFF Building Replacement PBI0003 Airport - ARFF Building Replacement $27,500 $27,500 $27,500 $27,500
Palm Beach International Airport - Aviation Workers Security Screening PBI0012 Airport - Aviation Workers Security Screening $250 $250 $250 $250
Palm Beach International Airport - Bond Project Contingency PBI0007 Airport - Bond Project Contingency $5,000 $5,000 $5,000 $5,000
Palm Beach International Airport - Campus-Wide Bird Netting and Piping Replacement PBI0022 Airport - Bird Netting and Piping Replacement $1,000 $1,000 $1,000 $1,000
Palm Beach International Airport - Ceiling Mount Flight Information System PBI0024 Airport - Ceiling Mount Flight Information System $1,500 $1,500 $1,500 $1,500
Palm Beach International Airport - Common Use Ticket Counter and Backwall Improvements PBI0023 Airport - Common Use Ticket Counter and Backwall Improvements $3,500 $3,500 $3,500 $3,500
Palm Beach International Airport - Concourse B PBI0001 Airport - Concourse B $94,000 $94,000 $94,000 $94,000
Palm Beach International Airport - Councourses A, B, & C Re-Roofing PBI0027 Airport - B, & C Re-Roofing $24,000 $24,000 $24,000 $24,000
Palm Beach International Airport - Economy Parking Lot Rehabilitation PBI0032 Airport - Economy Parking Lot Rehabilitation $5,000 $5,000 $5,000 $5,000
Palm Beach International Airport - EMAS Replacement PBI0031 Airport - EMAS Replacement $5,000 $5,000 $5,000 $5,000
Palm Beach International Airport - Feature Signage, Wayfinding Signage, & Landscaping Improvements PBI0009 Airport - Feature Signage, Wayfinding Signage, & Landscaping Improvements $2,250 $2,250 $2,250 $2,250
Palm Beach International Airport - High Mast Lighting Renovation PBI0018 Airport - High Mast Lighting Renovation $3,500 $3,500 $3,500 $3,500
Palm Beach International Airport - Park and Ride Booth Replacements PBI0030 Airport - Park and Ride Booth Replacements $2,000 $2,000 $2,000 $2,000
Palm Beach International Airport - Parking Toll Plaza Canopy Structure Replacement PBI0020 Airport - Parking Toll Plaza Canopy Structure Replacement $3,000 $3,000 $3,000 $3,000
Palm Beach International Airport - PC Air PBI0006 Airport - PC Air $3,269 $3,269 $3,269 $3,269
Palm Beach International Airport - Perimeter Fiber Loop PBI0028 Airport - Perimeter Fiber Loop $2,500 $2,500 $2,500 $2,500
Palm Beach International Airport - Perimeter Road and VSR Pavement Rehabilitation PBI0026 Airport - Perimeter Road and VSR Pavement Rehabilitation $10,000 $10,000 $10,000 $10,000
Palm Beach International Airport - Rehabilitation of Airport Entrance Roadway PHK0001 Airport - Rehabilitation of Airport Entrance Roadway $500 $500 $500 $500
Palm Beach International Airport - Rehabilitation of Airport Parking Lot PHK0002 Airport - Rehabilitation of Airport Parking Lot $1,000 $1,000 $1,000 $1,000
Palm Beach International Airport - Replace 14 Passenger Boarding Bridges PBI0025 Airport - Replace 14 Passenger Boarding Bridges $35,000 $35,000 $35,000 $35,000
Palm Beach International Airport - Replace Terminal Canopies PBI0029 Airport - Replace Terminal Canopies $2,500 $2,500 $2,500 $2,500
Palm Beach International Airport - Revenue Control Building Replacement PBI0005 Airport - Revenue Control Building Replacement $11,000 $11,000 $11,000 $11,000
Palm Beach International Airport - Rotating Beacon Replacement PBI0016 Airport - Rotating Beacon Replacement $500 $500 $500 $500
Palm Beach International Airport - Runway 10R/28L PBI0013 Airport - Runway 10R/28L $50,500 $50,500 $50,500 $50,500
Palm Beach International Airport - Switchgear PBI0010 Airport - Switchgear $22,500 $22,500 $22,500 $22,500
Palm Beach International Airport - Taxiway Rehabilitation PBI0004 Airport - Taxiway Rehabilitation $34,600 $34,600 $34,600 $34,600
Palm Beach International Airport - Terminal & Concourse Modernization PBI0011 Airport - Terminal & Concourse Modernization $40,000 $40,000 $40,000 $40,000
Palm Beach International Airport - Terminal Connections FDOT0086 Airport - Terminal Connections $13,000 $13,000 $13,000
Palm Beach International Airport - Terminal FIS Improvements PBI0033 Airport - Terminal FIS Improvements $20,000 $20,000 $20,000 $20,000
Palm Beach International Airport -Terminal Elevator Rehabilitation PBI0002 Airport - Terminal Elevator Rehabilitation $17,100 $17,100 $17,100 $17,100
45th St and I 95 to Port of Palm Beach FDOT0021 Road Capacity - Modify Connector of I-95, 45th St, and Port of Palm Beach $13,610 $13,610 $13,610
Mill and Repave Tropical Main Marginal along Berths #8 & #9 PORT0031 Seaport $1,500 $1,500 $1,500 $1,500
Port of Palm Beach - Replacement watermain along Avenue E between Port Road and Middle Rd PORT0025 Seaport $1,500 $1,500 $1,500 $1,500
Port of Palm Beach - Add additional lighting East to West PORT0014 Seaport $450 $450 $450 $450
Port of Palm Beach - Annex Property Improvements FDOT0039 Seaport - Seaport Capacity Project $1,000 $1,000 $1,000
Port of Palm Beach - Berth 18 PORT0010 Seaport - Berth 18 $12,000 $12,000 $12,000 $12,000
Port of Palm Beach - Bulk Facility Containment Wall FDOT0040 Seaport - Intermodal $2,000 $2,000 $2,000
Port of Palm Beach - Cargo Laydown - Phase 2 FDOT0041 Seaport - Intermodal Container Terminal $2,500 $2,500 $2,500
Port of Palm Beach - Cathodic protection installation on seal walls port wide PORT0019 Seaport $2,000 $2,000 $2,000 $2,000
Port of Palm Beach - Cemex Demo & Land Improvements FDOT0042 Seaport - Seaport Capacity Project $5,500 $5,500 $5,500
Port of Palm Beach - Container Yard / Bulk Improvements FDOT0043 Seaport - Intermodal Container Terminal $5,000 $5,000 $5,000
Port of Palm Beach - Container Yard Crane Pad Improvements FDOT0037 Seaport - Seaport Capacity Project $2,000 $2,000 $2,000
Port of Palm Beach - Cross reference utilities & site survey with field GIS survey PORT0013 Seaport $25 $25 $25 $25
Port of Palm Beach - Cruise and Port Administration Parking Structure PORT0002 Seaport $52,000 $52,000 $52,000 $52,000
Port of Palm Beach - Demo of Cold Storage Facility & Land Improvements FDOT0044 Seaport - Seaport Capacity Project $1,300 $1,300 $1,300
Port of Palm Beach - General Cargo Warehouse Relocation PORT0007 Seaport - General Cargo Warehouse Relocation $18,000 $18,000 $18,000 $18,000
Port of Palm Beach - Harbor & Channel Improvements (USACE Inlet Exp) FDOT0045 Seaport - Dredge Harbor $35,000 $35,000 $35,000
Port of Palm Beach - Install inner ring seals to the damaged 66" RCP under the main port entrance road PORT0018 Seaport $500 $500 $500 $500
Port of Palm Beach - Install new drainage system to west middle road and RR tracks PORT0035 Seaport $1,500 $1,500 $1,500 $1,500
Port of Palm Beach - Install storm drainage to all screening areas of the port PORT0032 Seaport $5,000 $5,000 $5,000 $5,000
Port of Palm Beach - Intermodal Cargo Transfer Facility FDOT0046 Seaport - Intermodal Container Terminal $25,000 $25,000 $25,000
Port of Palm Beach - Mill and Repace Tropical Main Marginal along Berths #8 & 9 PORT0020 Seaport $1,100 $1,100 $1,100 $1,100
Port of Palm Beach - New Acquired Property Development (Clearing, Grading, Pavement, and Utilities) PORT0001 Seaport $15,000 $15,000 $15,000 $15,000
Port of Palm Beach - New Rail Yard Storage Tracks PORT0008 Seaport - New Rail Yard Storage Tracks $10,000 $10,000 $10,000 $10,000
Port of Palm Beach - On Dock Rail Expansion & Rail Bridge FDOT0047 Seaport - Internal Rail $6,000 $6,000 $6,000
Port of Palm Beach - On Port Rail Facility Expansion Project FDOT0048 Seaport - Internal Rail $7,275 $7,275 $7,275
Port of Palm Beach - Pave and Drain Mullins property PORT0023 Seaport - Pave and Drain Mullins property $350 $350 $350 $350
Port of Palm Beach - Perform Site Survey to get up-to-date Site Plan PORT0012 Seaport $50 $50 $50 $50
Port of Palm Beach - PIDP Internal Roadway Improvements PORT0005 Seaport - PIDP Internal Roadway Improvements $6,000 $6,000 $6,000 $6,000
Port of Palm Beach - PIDP Main Gate Improvements PORT0004 Seaport - PIDP Main Gate Improvements $8,000 $8,000 $8,000 $8,000
Port of Palm Beach - PIDP Rail Yard Improvements PORT0003 Seaport - PIDP Rail Yard Improvements $11,000 $11,000 $11,000 $11,000
Port of Palm Beach - Rail Yard Working Track Expansion PORT0009 Seaport - Rail Yard Working Track Expansion $6,000 $6,000 $6,000 $6,000
Port of Palm Beach - Relocate High-mast #26 to the East PORT0015 Seaport - Beach - Relocate High-mast #26 to the East $120 $120 $120 $120
Port of Palm Beach - Repair edges of the SOG deck of Berth #14 PORT0028 Seaport $250 $250 $250 $250
Port of Palm Beach - Repair of the RC pile cap between Berths #7 & 8 PORT0022 Seaport $250 $250 $250 $250
Port of Palm Beach - Repair the damanged pavement around all settled manholes PORT0021 Seaport $500 $500 $500 $500
Port of Palm Beach - Repave Slip 3 pavement area PORT0034 Seaport - Repave Slip 3 pavement area $2,000 $2,000 $2,000 $2,000
Port of Palm Beach - Replace and/or Repair failing water system within Tropical Main Marginal PORT0026 Seaport $1,100 $1,100 $1,100 $1,100
Port of Palm Beach - Replace or Recondition bad valves of the water mains port wide PORT0016 Seaport $3,300 $3,300 $3,300 $3,300
Port of Palm Beach - Replace the asphalt pavement of Tropical Main Marginal with RCC PORT0033 Seaport $4,500 $4,500 $4,500 $4,500
"Port of Palm Beach - Replace the overhead lines located within the footprint of PIDP project underground and extend power services to new PID buildings" PORT0029 Seaport $2,500 $2,500 $2,500 $2,500
Port of Palm Beach - Convert to underground power cables north of CEMEX PORT0030 Seaport $1,500 $1,500 $1,500 $1,500
Port of Palm Beach - Retrofit all High-mast & Low-mast with LED fixtures-mast (18 reamining) PORT0024 Seaport $50 $50 $50 $50
Port of Palm Beach - Secondary Gate Circulation Improvements PORT0006 Seaport - Secondary Gate Circulation Improvements $200 $200 $200 $200
Port of Palm Beach - Slip 2 Widening PORT0011 Seaport - Slip 2 Widening $24,000 $24,000 $24,000 $24,000
Port of Palm Beach - Slip No. 1 Redevelopment & Enhancement FDOT0049 Seaport - Seaport Capacity Project $2,500 $2,500 $2,500
Port of Palm Beach - Slip No. 2 Redevelopment & Enhancement FDOT0050 Seaport - Seaport Capacity Project $30,000 $30,000 $30,000
Port of Palm Beach - SouthGate Expansion & Cold Storage Conversion FDOT0051 Seaport - Seaport Capacity Project $6,000 $6,000 $6,000
Port of Palm Beach - Survey the catch basins and storm sewers within the PIDP limits PORT0017 Seaport $50 $50 $50 $50
Port of Palm Beach - Survey the locations of water and fire valves PORT0027 Seaport $50 $50 $50 $50
Port of Palm Beach - Tropical Western Cargo Bldgs. Demo & Land Impv FDOT0052 Seaport - Seaport Capacity Project $2,000 $2,000 $2,000
Port of Palm Beach - Waterside Cargo Terminal Redevelopment FDOT0038 Seaport - Intermodal Container Terminal $4,000 $4,000 $4,000
Port of Palm Beach/ Blue Heron Blvd SIS Connector - I 95 - Port of Palm Beach at US 1 FDOT0053 Seaport - Modify Connector $23,500 $23,500 $23,500