Cost Feasible Plan & TPA Priorities
Vision 2050 is required to include a financial plan that establishes "Cost Feasible" transportation priorities — those projects that can reasonably be expected to be completed based on available revenues through the horizon year of 2050. This Cost Feasible Plan reflects the TPA's priorities for expenditures of federal and state funds in Palm Beach County.
Additional transportation priorities supported by the TPA but not completable based on available financial resources may be included for "Illustrative" purposes. Those that are fully planned and supported may require discretionary funding to advance to implementation.
Programming Time Bands
The Cost Feasible Plan programs available funding over the following time bands:
- FY 25–29 (the TPA's currently adopted Transportation Improvement Program)
- FY 30–35
- FY 36–40
- FY 41–50
Financial Summary
| Category | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | Total | Unfunded (incl. Illustrative) |
|---|---|---|---|---|---|---|
| TPA Revenues | $434,499 | $244,230 | $208,080 | $418,770 | $1,305,579 | — |
| TPA Prioritized Expenditures | $410,062 | $162,333 | $148,734 | $298,030 | $1,019,158 | $5,178,304 |
| TA Set-Aside | $24,437 | $33,674 | $28,080 | $5,616 | $91,807 | — |
| Balance | — | $48,223 | $31,266 | $115,124 | $194,614 | — |
| Category | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | Total | Unfunded (incl. Illustrative) |
|---|---|---|---|---|---|---|
| FDOT Expenditures | $433,384 | $282,509 | $286,143 | $2,847,432 | $3,849,468 | $10,055,690 |
| Turnpike Expenditures | $1,195,700 | $745,041 | $— | $— | $1,940,741 | $4,007 |
Project Table Summaries
The following tables contain the full project-level detail for each funding category. Each table opens in a scrollable region and includes all projects with their LRTP reference number, FM number, description, and costs broken down by phase (PDE, PE, ROW, CST) and time band. Use the links below to jump directly to each table.
TPA Priorities — Cost Feasible
Projects supported by the TPA for federal and state funding, within available revenues through 2050.
View full table ↓TPA Priorities — Illustrative Projects
TPA-supported projects that align with Goals and Objectives but do not have cost-feasible funding available for implementation.
View full table ↓Maintenance Projects
Ongoing operations and maintenance of the transportation system, including larger-scale maintenance projects funded by federal and state sources.
View full table ↓Airports & Seaports Projects
Specific projects carried out by seaport and airport partner agencies, supported by the TPA for federal and state discretionary grants.
View full table ↓Project Data Tables
Full project listings with costs by phase and time band. All costs in thousands of dollars. Use the scroll region to navigate wide tables horizontally, or use keyboard arrow keys after focusing the table region.
TPA Priorities — Cost Feasible
| Project Information | Present Day Costs FY24 (in thousands) | Previous | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | CF Total | Unfunded | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project Name | LRTP # | FM # | Description | PDE | PE | ROW | CST | Total | O&M | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | |||
| 25th St Complete Street from Australian Ave to Broadway Ave | LI-19-4 | 4460901 | Complete Streets - 4 to 3 Lane Repurposing, R/R gates, ADA, buffered bicycle lane, lighting, sidewalks | — | — | — | $7,038 | $7,038 | — | — | $5 | — | — | $7,033 | — | — | — | — | — | — | — | — | — | — | — | — | $7,038 | — |
| 36th St Complete Street from Australian Ave to Poinsettia Ave in West Palm Beach | LI-17-1-5 | 4415701 | Complete Streets - Construct buffered bicycle lanes, sidewalks, grade separated pedestrian bridge | — | — | — | $12,296 | $12,296 | — | — | $1,370 | — | — | $10,926 | — | — | — | — | — | — | — | — | — | — | — | — | $12,296 | — |
| 49th St complete street from Greenwood Ave to North Flagler Drive | TA-22-3 | 4508621 | Complete Streets - ADA curb ramps, sidewalks, traffic calming, sharrows | — | — | — | — | — | — | — | — | — | — | $565 | — | — | — | — | — | — | — | — | — | — | — | — | $565 | — |
| 7th St complete street from Australian Ave to Tamarind Blvd | LI-23-4 | TBD | Complete Streets - Buffered bicycle lanes, sidewalk widening | — | — | — | $1,848 | $1,848 | — | — | — | — | — | — | — | — | — | $2,458 | — | — | — | — | — | — | — | — | $2,458 | — |
| Alt A1A Complete Street from Lighthouse Dr to Donald Ross Rd | PBG0001 | Complete Streets - Grade separated pedestrian bridge at 2 locations, sidewalk widening, shared-use paths. The City is also supportive of a 8’ pathway on the W side of the road, in addition to the East side already noted. | $274 | $1,643 | — | $10,680 | $12,597 | — | — | — | — | — | — | $364 | — | — | — | — | — | — | — | — | — | — | — | $364 | $12,323 | |
| Atlantic Ave (SR 806) Complete Street from NW 12th Ave to NW 2nd Ave | DEL0011 | Complete Streets - Complete streets design / beautification | $42 | $253 | — | $1,647 | $1,942 | — | — | — | — | — | — | $56 | — | — | — | — | — | — | — | — | — | — | — | $56 | $1,900 | |
| Atlantic Ave (SR 806) Intersection Improvements @ Congress Ave | DEL0009 | Complete Streets - Pedestrian, bicycle, accessibility, safety | $56 | $336 | — | $2,184 | $2,576 | — | — | — | — | — | — | $74 | — | — | — | — | $541 | — | $3,517 | — | — | — | — | $4,132 | — | |
| Avenue A Complete Streets from 4th Ave to Main St | BEL0001 | Complete Streets - Complete street | $83 | — | — | — | $83 | — | — | $94 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $94 | — | |
| Barwick Rd from Lake Ida Rd to Sabal Lakes Rd (N) | LI-22-5 | 4507931 | Complete Streets - Shared use path, sidewalk | — | — | — | $2,531 | $2,531 | — | — | — | $5 | — | $2,091 | — | — | — | — | — | — | — | — | — | — | — | — | $2,096 | — |
| Blue Heron Blvd (SR 708) Complete Street from I 95 to ICWW | RB0001 | Complete Streets - Corridor study | $1,000 | — | — | — | $1,000 | — | — | — | — | — | — | $1,330 | — | — | — | — | — | — | — | — | — | — | — | $1,330 | — | |
| Brant Bridge connector from Lindell Blvd to Brant Bridge | LI-17-7 | 4415861 | Complete Streets - Sidewalks, separated bicycle lane | — | — | — | $2,540 | $2,540 | — | — | $5 | — | — | $2,535 | — | — | — | — | — | — | — | — | — | — | — | — | $2,540 | — |
| Burns Rd from Military Trl to Alt A1A | TA-21-1 | 4490051 | Complete Streets - Separated bicycle track | — | — | — | — | — | — | — | — | — | — | $1,400 | — | — | — | — | — | — | — | — | — | — | — | — | $1,400 | — |
| C-2 Canal from Greenview Shores Blvd to Bent Creek Rd | LI-20-5 | 4483061 | Complete Streets - Shared use path | — | — | — | $616 | $616 | — | — | $5 | — | — | $549 | — | — | — | — | — | — | — | — | — | — | — | — | $554 | — |
| C-8 Canal from Forest Hill Blvd to Stribling Way | TA-21-4 | 4490061 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | $734 | — | — | — | — | — | — | — | — | — | — | — | — | $734 | — |
| Camino Real from Spanish River Rd to South Ocean Blvd | TA-23-2 | TBD | Complete Streets - Buffered bicycle lanes, sidewalk | — | — | — | — | — | — | — | — | $5 | — | $1,362 | — | — | — | — | — | — | — | — | — | — | — | — | $1,367 | — |
| Congress Ave (SR 807) Complete Street from City of Boca Raton to City of Boynton Beach | DEL0012 | Complete Streets - Sidewalk, bicycle lane, ADA, safety | $231 | $1,388 | — | $9,021 | $10,640 | — | — | — | — | — | — | $308 | — | — | — | — | — | — | — | — | — | — | — | $308 | $10,408 | |
| Congress Ave (SR 807) Safety and Transit Improvements from Lake Worth Rd to Forest Hill Blvd | MP-21-2 | 4498791 | Complete Streets - Lighting, crosswalks, intersection, transit stops | — | — | — | $2,966 | $2,966 | — | — | — | $434 | — | $2,532 | — | — | — | — | — | — | — | — | — | — | — | — | $2,966 | — |
| Cresthaven Blvd from S Jog Rd to S Military Trl | LI-19-2 | 4460861 | Complete Streets - Buffered bicycle lane, intersection modifications | — | — | — | $4,603 | $4,603 | — | — | $5 | — | — | $4,597 | — | — | — | — | — | — | — | — | — | — | — | — | $4,602 | — |
| Dolan St Complete Street from Sylvia Ln to Congress Ave | PS0004 | Complete Streets - Sidewalk, bicycle Lane | $8 | $48 | — | $314 | $370 | — | — | — | — | — | — | $11 | — | — | — | — | — | — | — | — | — | — | — | $11 | $362 | |
| Fairchild Ave from Fairchild Gardens Ave to Campus Dr | TA-22-2 | 4508291 | Complete Streets - Buffered bicycle lane, pathway | — | — | — | — | — | — | — | — | — | — | $1,408 | — | — | — | — | — | — | — | — | — | — | — | — | $1,408 | — |
| Federal Hwy @ Spanish River Blvd | MP-20-1 | 4482641 | Complete Streets - Intersection modification, bicycle lane, traffic signal hardening | — | — | — | $1,715 | $1,715 | — | — | — | $300 | — | — | — | — | — | $2,281 | — | — | — | — | — | — | — | — | $2,581 | — |
| Federal Hwy Intersection Improvements @ 20th Street | BOC0024 | Complete Streets - Safety, traffic signals | $67 | $400 | — | $2,599 | $3,065 | — | — | — | — | — | — | $89 | $532 | — | — | — | — | — | $4,184 | — | — | — | — | $4,804 | — | |
| Flagler Dr Complete Street from Gregory Place to 59th Street | WPB0051 | Complete Streets - Roadway modification, landscaping, bicycle lanes, sidewalks, safety | $569 | $3,416 | — | $22,203 | $26,189 | — | — | — | — | — | — | $757 | $4,543 | — | — | — | — | — | $35,747 | — | — | — | — | $41,048 | — | |
| Gardens Pkwy Complete Street from Alt A1A to Prosperity Farms Rd | PBG0012 | TBD | Complete Streets - Pathway, bicycle lanes | $105 | $631 | — | $4,103 | $4,840 | — | — | — | $5 | — | $4,620 | — | — | — | — | — | — | — | — | — | — | — | — | $4,625 | $105 |
| Grapeview Blvd from Key Lime Blvd to 60th St and Key Lime Blvd from Hall to M-1 Canal | TA-21-3 | 4490021 | Complete Streets - Shared use path, pathway | — | — | — | — | — | — | — | — | — | — | $1,658 | — | — | — | — | — | — | — | — | — | — | — | — | $1,658 | — |
| Greenbriar Blvd from Aero Club Drive to Greenview Shored Blvd. | LI-20-4 | 4482991 | Complete Streets - Bicycle lanes | — | — | — | $2,453 | $2,453 | — | — | $5 | — | — | $2,421 | — | — | — | — | — | — | — | — | — | — | — | — | $2,426 | — |
| Greenbrier Dr Complete Street from Davis Rd to Congress Ave | PS0002 | Complete Streets - Sidewalk, bicycle lanes | $36 | $217 | — | $1,411 | $1,665 | — | — | — | — | — | — | $48 | — | — | — | — | — | — | — | — | — | — | — | $48 | $1,628 | |
| Greenview Shores Blvd from Binks Forest Dr to Wellington Tr | LI-19-6 | 4460821 | Complete Streets - Bicycle lanes | — | — | — | $1,258 | $1,258 | — | — | $5 | — | — | $1,253 | — | — | — | — | — | — | — | — | — | — | — | — | $1,258 | — |
| Hamlin Blvd from Hall Blvd to Grapeview Blvd; Grapeview Blvd from Hamlin Blvd to Citrus Grove Blvd; Citrus Grove Blvd from Hall Blvd to Avocado Blvd | TA-22-1 | 4507871 | Complete Streets - Shared use path, pathway | — | — | — | — | — | — | — | — | — | — | $1,300 | — | — | — | — | — | — | — | — | — | — | — | — | $1,300 | — |
| Holly Dr Complete Street from N. Military Trail to Lighthouse Dr | PBG0015 | Complete Streets - Widen sidewalk, crosswalks, grade separated pedestrian bridge | $37 | $221 | — | $1,435 | $1,692 | — | — | — | — | — | — | — | — | — | — | $59 | — | — | — | — | — | — | — | $59 | $1,656 | |
| Hood Rd Complete Street from Jog Rd to Alt A1A | PBG0009 | Complete Streets - Shared use path, bicycle lanes, sidewalk | $200 | $1,202 | — | $7,816 | $9,219 | — | — | — | — | — | — | $267 | — | — | — | — | — | — | — | — | — | — | — | $267 | $9,019 | |
| ITID Pathways along 140th Ave N from Orange St to 61st St N and 61st St N from 140th Ave N to the M-1 Canal | TA-23-5 | TBD | Complete Streets - Pathway | — | — | — | — | — | — | — | — | $5 | — | $526 | — | — | — | — | — | — | — | — | — | — | — | — | $531 | — |
| ITID Pathways along 140th Ave N, Temple Blvd, and Hall Blvd | LI-23-1 | TBD | Complete Streets - Shared use path, pathway | — | — | — | $5,369 | $5,369 | — | — | — | — | — | — | — | — | — | $7,141 | — | — | — | — | — | — | — | — | $7,141 | — |
| Kyoto Gardens Dr Complete Street from N Military Trail to Fairchild Gardens Ave | PBG0002 | Complete Streets - Intersection reconstruction, roundabout, shared use path, bicycle lanes, lane narrowing | $73 | $440 | — | $2,860 | $3,373 | — | — | — | — | — | — | — | — | — | — | $118 | — | — | — | — | — | — | — | $118 | $3,300 | |
| Lake Ave Complete Street from Belvedere Rd and Southern Blvd | WPB0056 | Complete Streets - Lane narrowing, landscaping, bicycle lanes, safety | $67 | $404 | — | $2,629 | $3,101 | — | — | — | — | — | — | — | — | — | — | $109 | — | — | — | — | — | — | — | $109 | $3,033 | |
| Lake Ida Rd Intersection Improvements @ N Congress Ave | DEL0008 | Complete Streets - Pedestrian, bicycle, accessibility, safety | $56 | $336 | — | $2,184 | $2,576 | — | — | — | — | — | — | — | — | — | — | $90 | $541 | — | $3,517 | — | — | — | — | $4,148 | — | |
| Lilac St from North Military Trl to Plant Dr | TA-23-4 | TBD | Complete Streets - Shared use path, pathway, crosswalk | — | — | — | — | — | — | — | — | $5 | — | $1,144 | — | — | — | — | — | — | — | — | — | — | — | — | $1,149 | — |
| Linton Blvd Intersection Improvements @ S Congress Ave | DEL0010 | Complete Streets - Pedestrian, bicycle, accessibility, safety | $56 | $336 | — | $2,184 | $2,576 | — | — | — | — | — | — | $74 | $447 | — | $2,905 | — | — | — | — | — | — | — | — | $3,427 | — | |
| Mercer Ave Complete Street from Belvedere Rd to Australian Ave | WPB0060 | Complete Streets - Maintenance, curb relocation, drainage, landscaping, ADA | $3,735 | $22,409 | — | $145,658 | $171,802 | — | — | — | — | — | — | $4,967 | — | — | — | — | — | — | — | — | — | — | — | $4,967 | $168,067 | |
| Military Trl (SR 809) Complete Street from C-17 Canal to Donald Ross Rd | PBG0018 | Complete Streets - Widen sidewalks, shared use paths, crosswalks, sidewalk, ADA, bicycle boulevard | $258 | $1,546 | — | $10,048 | $11,852 | — | — | — | — | — | — | — | — | — | — | $415 | — | — | — | — | — | — | — | $415 | $11,594 | |
| Military Trl (SR 809) Shared Use Path from Town Center Mall to Spanish River Park | BOC0039 | Complete Streets - Shared use path | $250 | — | — | — | $250 | — | — | — | — | — | — | $333 | — | — | — | — | — | — | — | — | — | — | — | $333 | — | |
| Mizner Blvd Complete Street from S Federal Hwy to N Federal Hwy | BOC0034 | Complete Streets - Complete Streets: Multimodal Accommodations | $66 | $398 | — | $2,589 | $3,054 | — | — | — | — | — | — | — | — | — | — | $107 | — | — | — | — | — | — | — | $107 | $2,988 | |
| Northlake Blvd Complete Street from PBG City limits to Congress Ave | PBG0016 | Complete Streets - Sidewalk widening, shared use path, crosswalks | $107 | $639 | — | $4,155 | $4,900 | — | — | — | — | — | — | $142 | — | — | — | — | — | — | — | — | — | — | — | $142 | $4,794 | |
| NW 2nd Ave Complete Street from E Palmetto Park Rd to NW 67th St | BOC0038 | Complete Streets - Protected bicycle lanes | $281 | $1,685 | — | $10,951 | $12,917 | — | — | — | — | — | — | — | — | — | — | $452 | — | — | — | — | — | — | — | $452 | $12,636 | |
| NW 6th Way from South of NW 38th Drive/Circle to Spanish River Blvd | TA-23-1 | TBD | Complete Streets - Shared use path, intersection modifications | — | — | — | — | — | — | — | — | $5 | — | $969 | — | — | — | — | — | — | — | — | — | — | — | — | $974 | — |
| Okeechobee Gateway from West of Australian Ave to the ICWW | TPA0014 | Complete Streets - Corridor Study | $2,000 | — | — | — | $2,000 | — | — | — | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | |
| Old Dixie Hwy Complete Street from Linton Blvd to SE 10th St | DEL0004 | Complete Streets - Corridor Study | $34 | $205 | — | $1,333 | $1,572 | — | — | — | — | — | — | $45 | $273 | — | — | — | — | — | $2,146 | — | — | — | — | $2,464 | — | |
| Old Okeechobee Rd Complete Street from Mercer Ave to Parker Ave | WPB0061 | Complete Streets - Maintenance, roadway, sidewalks, ADA, protected bicycle lanes, crosswalks | $33 | $196 | — | $1,272 | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $65 | — | — | — | $65 | $1,468 | |
| Palm Beach Lakes Complete Street from Okeechobee Blvd 7th Street | WPB0055 | Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience | $141 | $843 | — | $5,481 | $6,464 | — | — | — | — | — | — | — | — | — | — | $226 | — | — | — | — | — | — | — | $226 | $6,324 | |
| Palmetto Park Road Complete Street from SW 3rd Ave to A1A | BOC0030 | Complete Streets - Corridor study | $89 | $535 | — | $3,479 | $4,104 | — | — | — | — | — | — | $119 | — | — | — | — | — | — | — | — | — | — | — | $119 | $4,015 | |
| Parker Ave Complete Street from Belvedere Rd to Okechobee Blvd | WPB0062 | Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience | $71 | $428 | — | $2,783 | $3,283 | — | — | — | — | — | — | — | — | — | — | $115 | — | — | — | — | — | — | — | $115 | $3,212 | |
| PGA Blvd (SR 876) Complete Street from Beeline Hwy to Prosperity Farms Rd | PBG0013 | Complete Streets - Shared use path, buffered bicycle lane, widen sidewalk, crosswalks | $852 | $5,110 | — | $33,213 | $39,175 | — | — | — | — | — | — | — | — | — | — | $1,371 | — | — | — | — | — | — | — | $1,371 | $38,323 | |
| Prosperity Farms from 800' N of Northlake Blvd to Donald Ross Rd | LI-21-2 | 4498471 | Complete Streets - Bicycle Lanes | — | — | — | $7,700 | $7,700 | — | — | $5 | — | — | $5,975 | — | — | — | — | — | — | — | — | — | — | — | — | $5,980 | — |
| Quadrille Blvd Complete Street from Okeechobee Blvd to N Dixie Hwy | WPB0044 | Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience | $65 | $389 | — | $2,530 | $2,984 | — | — | — | — | — | — | $86 | — | — | — | — | — | — | — | — | — | — | — | $86 | $2,919 | |
| Shenondoah Rd Complete Street from Military Trl to Village Blvd | WPB0053 | Complete Streets - Roadway, landscaping, sidewalk, bicycle lanes, safety, ADA, resilience | $50 | $298 | — | $1,934 | $2,281 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $99 | — | — | — | $99 | $2,232 | |
| South East Coast St and S. H Street | LI-20-3 | 4483541 | Complete Streets - Traffic operations, bicycle lanes | — | — | — | $7,889 | $7,889 | — | — | — | $5 | — | $7,884 | — | — | — | — | — | — | — | — | — | — | — | — | $7,889 | — |
| Spruce Ave from 36th St to 40th St | TA-23-3 | TBD | Complete Streets - Bicycle lanes, sidewalks, ADA, crosswalks, safety, lighting | — | — | — | — | — | — | — | — | $5 | — | $1,578 | — | — | — | — | — | — | — | — | — | — | — | — | $1,583 | — |
| SR 7 Complete Street from PBC Line to SR 80 (Southern Blvd) | FDOT0125 | Complete Streets - Corridor study | $300 | — | — | — | $300 | — | — | — | — | — | — | $399 | — | — | — | — | — | — | — | — | — | — | — | $399 | — | |
| SR 7 from Glades Rd to Bridgebrook Dr | MP-21-4 | 4476701 | Complete Streets - Resurfacing, bicycle lanes | — | — | — | $11,749 | $11,749 | — | — | — | — | — | $11,749 | — | — | — | — | — | — | — | — | — | — | — | — | $11,749 | — |
| SR 715 from Hatcher Rd to Paul Rardin Park, SR 715 from Airport Rd to SW 14th St | MP-20-5 | 4479451 | Complete Streets - Sidewalk | — | — | — | $2,030 | $2,030 | — | — | — | $378 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $378 | $2,030 |
| Summit Blvd Complete Street from Jog Rd to Parker Ave | WPB0048 | Complete Streets - Corridor study | $658 | $3,945 | — | $25,645 | $30,248 | — | — | — | — | — | — | — | — | — | — | $1,059 | — | — | — | — | — | — | — | $1,059 | $29,590 | |
| SW 10th Ave Complete Street from Linton Blvd to SW 10th St | DEL0007 | Complete Streets - Corridor study | $34 | $205 | — | $1,333 | $1,572 | — | — | — | — | — | — | — | — | — | — | $55 | — | — | — | — | — | — | — | $55 | $1,538 | |
| SW 18th St from Military Trl to Addison Ave | TA-22-5 | TBD | Complete Streets - Shared use path, sidewalks, crosswalks | — | — | — | — | — | — | — | — | — | — | $1,565 | — | — | — | — | — | — | — | — | — | — | — | — | $1,565 | — |
| Temple Blvd, Hall Blvd, 140th Ave Speed Tables | LI-22-7 | 4507951 | Complete Streets - Seminole Speed Tables | — | — | — | $627 | $627 | — | — | — | $5 | — | $526 | — | — | — | — | — | — | — | — | — | — | — | — | $531 | — |
| US 1 Complete Street from 59th St to Northlake Blvd | 2045-TPA021.B | 4383862 | Complete Streets - Reconstruct as 4 lanes with multimodal improvements | — | — | — | — | — | — | $2,307 | — | — | — | $12,380 | — | — | — | — | — | — | — | — | — | — | — | — | $12,380 | — |
| US 1 from Camino Real Rd to NE 8th St/Mizner Blvd | 2045-TPA022.B | 4383865 | Complete Streets - Lane repurposing from 6L to 4L & associated multimodal improvements. | — | — | — | — | — | — | $814 | — | — | — | $7,143 | — | — | — | — | — | — | — | — | — | — | — | — | $7,143 | — |
| US 1 from Northlake Blvd to Parker Bridge in North Palm Beach | MP-17-1f | 4383867 | Complete Streets - Lane repurposing from 6L to 4L with shared-use paths, bicycle lanes, landscaping and furnishing zone | — | — | — | $8,672 | $8,672 | — | — | — | $920 | — | — | — | — | — | $11,534 | — | — | — | — | — | — | — | — | $12,454 | — |
| US 1 from Universe Blvd to Indiantown Road | MP-23-1 | TBD | Complete Street: Multimodal Accommodation | — | — | — | $10,700 | $10,700 | — | — | — | — | — | — | — | — | — | $14,231 | — | — | — | — | — | — | — | — | $14,231 | — |
| US 1 Lane Repurpising from Dixie/Federal Junction to Gregory Rd in Lake Worth Beach | MP-17-1g | TBD | Complete Streets - Lane Repurposing from 4L to 3L; associated multimodal facilities | — | — | — | $5,674 | $5,674 | — | — | — | — | — | — | — | — | — | $7,546 | — | — | — | — | — | — | — | — | $7,546 | — |
| US 1 Reconstruction from 25th St to 45th St in West Palm Beach | MP-17-1d | 4383866 | Complete Streets - Reconstruct roadway to include pedestrian and bicycle facilities and safety | — | — | — | $15,592 | $15,592 | — | — | $358 | $300 | — | — | — | — | — | $20,737 | — | — | — | — | — | — | — | — | $21,395 | — |
| Various Locations - Local Roads | TA-22-4 | 4508241 | Complete Streets - Install pedestrian and bicycle network wayfinding signage | — | — | — | — | — | — | — | — | — | — | $874 | — | — | — | — | — | — | — | — | — | — | — | — | $874 | — |
| Various Locations - Residential Roads | LI-20-6 | 4483051 | Complete Streets - Construct ADA Improvements - Sidewalks and Curb Ramps | — | — | — | $671 | $671 | — | — | $5 | — | — | $666 | — | — | — | — | — | — | — | — | — | — | — | — | $671 | — |
| Village Blvd Complete Street from Palm Beach Lakes Blvd to 45th St | WPB0002 | Complete Streets - Complete Street: Multimodal Accommodation | $270 | $1,619 | — | $10,522 | $12,410 | — | — | — | — | — | — | $359 | — | — | — | — | — | — | — | — | — | — | — | $359 | $12,141 | |
| Wellington Trace from east of Draft Horse Ln to Greenview Shores Blvd | LI-23-7 | TBD | Complete Streets - Complete Street: Multimodal Accommodation | — | — | — | $2,988 | $2,988 | — | — | — | — | — | — | — | — | — | $3,974 | — | — | — | — | — | — | — | — | $3,974 | — |
| El Rio Trail from Glades Rd to Yamato Rd | TA-21-2 | 4489991 | Safety - Lighting | — | — | — | — | — | — | — | — | — | — | $1,269 | — | — | — | — | — | — | — | — | — | — | — | — | $1,269 | — |
| Southern Blvd (SR 80) from SR 15 to CR 880 | MP-18-2 | 4417562 | Lighting - Lighting | — | — | — | $27,927 | $27,927 | — | $16,331 | — | $496 | — | $11,100 | — | — | — | — | — | — | — | — | — | — | — | — | $11,596 | — |
| A1A (N Ocean Dr) Resilient Reconstruction from Pine Roint Rd to John D MacArthur State Park | RB0002 | Resilience - Elevate roadway, bicycle lanes, sidewalks, ADA | $889 | $5,332 | — | $34,656 | $40,876 | — | — | — | — | — | — | $1,182 | — | — | — | — | — | — | — | — | — | — | — | $1,182 | $39,988 | |
| Atlantic Ave (SR 806) Lane Addition from Cumberland Dr to Jog Rd | 2045-TPA002.D | 4405755 | Road Capacity - Lane Addition: 4L to 6L | — | — | — | — | — | — | $2,451 | — | $94 | $16,638 | $23,936 | — | — | — | — | — | — | — | — | — | — | — | — | $40,668 | — |
| Atlantic Ave (SR 806) Lane Addition from SR 7 to Lyons Rd | 2045-TPA001 | 2296584 | Road Capacity - Lane Addition: 2L to 4L | — | $4,313 | $5,000 | $21,564 | $30,877 | — | $40,412 | — | $.363 | $3,074 | $140 | — | — | — | — | — | — | — | — | — | — | — | — | $3,215 | — |
| Atlantic Ave (SR 806) Lane Addition from Turnpike to Cumberland Rd | 2045-TPA002.C | 4405754 | Road Capacity - Lane Addition: 4L to 6L | — | $1,691 | $12,000 | $45,000 | $58,691 | — | $1,854 | — | $6 | $11,494 | $39,989 | — | — | — | — | — | — | — | — | — | — | — | — | $51,489 | — |
| Flavor Pict Rd road extension from Lyons Rd to Hagen Ranch Rd | PAL0097 | 2023500 | Road Capacity - Extention, includes new bridge over Florida's Turnpike | — | — | — | $15,525 | $15,525 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $15,525 |
| Hooker Hwy (SR 812) from SR 715 to US 441 | 2045-TPA012 | TBD | Road Capacity - Lane Addition: 2L to 4L | $661 | $2,643 | $3,964 | $13,213 | $20,480 | — | — | — | — | — | — | $879 | $3,515 | $5,272 | — | — | — | — | — | — | — | — | $26,425 | $36,090 | — |
| Indiantown Rd (SR 706) Intersection Improvements at Central Blvd | MP-21-6 | 4499351 | Road Capacity - PD&E Congestion management - Displaced Left Turn | $1,010 | — | — | — | $1,010 | — | — | $1,010 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,010 | — |
| N Dixie Hwy Complete Street from Okeechobee to Banyan Blvd | WPB0010 | Road Capacity - Corridor Study | $113 | $677 | — | $4,400 | $5,190 | — | — | — | — | — | — | — | — | — | — | $182 | — | — | — | — | — | — | — | $182 | $5,077 | |
| SR 7 Lane Addition from Okeechobee Blvd to 60th St | 2045-TPA013 | 2296647 | Road Capacity - Lane Addition: 2L to 4L | — | — | — | — | — | — | $477 | — | — | — | $43,416 | — | — | — | — | — | — | — | — | — | — | — | — | $43,416 | — |
| SR 7 Road Extension from 60th St to Northlake Blvd | FDOT0016 | 2296643, 2296645, 2296646 | Road Capacity - Road construction, side path, intersections | — | — | — | $93,989 | $93,989 | — | $8,563 | — | — | — | $85,638 | — | — | — | — | — | — | — | — | — | — | — | — | $85,638 | — |
| SR 80 Bypass/US 27 Connector from SR 80/US 27 to SR 715 | FDOT0083 | 4417571 | Road Capacity - Extension/Bypass | $2,750 | $4,313 | $5,000 | $38,605 | $50,668 | — | — | $2,750 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,750 | $47,918 |
| Boca Raton Traffic Signals | LI-23-3 | TBD | Signals - TSMO | — | — | — | $2,683 | $2,683 | — | — | — | — | — | — | — | — | — | $3,568 | — | — | — | — | — | — | — | — | $3,568 | — |
| Boca Traffic Signal Improvements at Various Locations | BOC0053 | Signals - Traffic Signal | — | $191 | — | $1,243 | $1,435 | — | — | — | — | — | — | — | — | — | — | — | $308 | — | $2,002 | — | — | — | — | $2,310 | — | |
| Congress Ave (PalmTran - Route 2) - TSMO Improvements | PAL0185 | Signals - Traffic Signals, TSMO | — | $6,210 | — | $40,365 | $46,575 | — | — | — | — | — | — | — | — | — | — | — | $9,998 | — | — | — | — | — | $80,730 | $90,728 | — | |
| Forest Hill Blvd (PalmTran - Route 46) - TSMO Improvements | PAL0200 | Signals - TSMO | — | $2,250 | — | $14,625 | $16,875 | — | — | — | — | — | — | — | — | — | — | — | $3,623 | — | — | — | — | — | $29,250 | $32,873 | — | |
| Forest Hill Blvd (SR 882) Safety and Transt Improvements from W of Jog Rd to Military Trl | MP-21-1 | 4498771 | Signals - Lighting, transit operations, crosswalks, bicycle lanes, intersections | — | — | — | $2,616 | $2,616 | — | — | — | $670 | — | $1,946 | — | — | — | — | — | — | — | — | — | — | — | — | $2,616 | — |
| Glades Rd (SR 808) at Town Center Blvd; I 95 NB off ramp at W Palmetto Park Rd; I 95 SB off ramp at Palmetto Park Rd; US-1 at Royal Palm Way; US-1 at Hidden Valley Blvd | MP-20-3.A | 4480641 | Signals - Traffic signal hardening | — | $479 | — | $2,847 | $3,326 | — | — | — | $479 | — | $2,847 | — | — | — | — | — | — | — | — | — | — | — | — | $3,326 | — |
| Lake Worth Rd (PalmTran - Route 62) - TSMO Improvements | PAL0207 | Signals - Traffic Signals, TSMO | — | $3,420 | — | $22,230 | $25,650 | — | — | — | — | — | — | — | $4,549 | — | — | — | — | — | — | — | — | — | $44,460 | $49,009 | — | |
| Lake Worth Rd (SR 802) ITS from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd | MP-19-1a | TBD | Signals - TSMO | — | — | — | $1,000 | $1,000 | — | — | — | — | — | $1,000 | — | — | — | — | — | — | — | — | — | — | — | — | $1,000 | — |
| Military Trl (SR 809) (PalmTran - Route 3) - TSMO Improvements | PAL0186 | Signals - Traffic Signals, TSMO | — | $7,470 | — | $48,555 | $56,025 | — | — | — | — | — | — | — | — | — | — | — | $12,027 | — | — | — | — | — | $97,110 | $109,137 | — | |
| Okeechobee Blvd (PalmTran - Route 40/43) - TSMO Improvements | PAL0195 | Signals - Traffic Signals, TSMO | — | $4,950 | — | $32,175 | $37,125 | — | — | — | — | — | — | — | $6,584 | — | — | — | — | — | $51,802 | — | — | — | — | $58,385 | — | |
| PalmTran - Route 94 - TSMO Improvements | PAL0221 | Signals - Traffic Signals, TSMO | — | $1,530 | — | $9,945 | $11,475 | — | — | — | — | — | — | — | — | — | — | — | $2,463 | — | — | — | — | — | $19,890 | $22,353 | — | |
| SR A1A at Spanish River Blvd and Camino Real (include w/ FM 4476611); US-1 at Jeffery St, NE 32nd St, NE 20th St, Fire Station #1, NE Mizner Blvd, SE Mizner Blvd, and Camino Real; Yamato Rd at NW 2nd Ave (include w/ FM 447657.1); Glades Rd at NW 2nd Ave and Pinehurst Ln; I 95 NB Ramp at Peninsula Corp Dr; I 95 SB Ramp at Peninsula Corp Dr | MP-21-3 | 4498751 | Signals - Traffic Signal Modification | — | — | — | $5,090 | $5,090 | — | — | — | $820 | — | — | — | — | — | $6,770 | — | — | — | — | — | — | — | — | $7,590 | — |
| Toney Penna Dr Complete Street from Military Trl to Central Blvd | JPT0001 | Signals - Intersection, buffered bicycle lane, crosswalks | $500 | $300 | — | $6,347 | $7,147 | — | — | $565 | — | — | — | — | $399 | — | $8,442 | — | — | — | — | — | — | — | — | $9,406 | — | |
| Traffic Signal resilience improvements: Atlantic Ave @ Military Trl; Belvedere @ Military Trl; Forest Hill Blvd @ I 95 | MP-20-2-4.A | 4479441 | Signals - Traffic signal hardening | — | $166 | — | $1,491 | $1,657 | — | — | — | $166 | — | $1,491 | — | — | — | — | — | — | — | — | — | — | — | — | $1,657 | — |
| Traffic Signal Upgrades | LI-23-6 | TBD | Signals - Traffic Signals | — | — | — | $6,813 | $6,813 | — | — | — | — | — | — | — | — | — | $9,061 | — | — | — | — | — | — | — | — | $9,061 | — |
| Traffic Signal Upgrades | MP-23-3 | TBD | Signals - Traffic Signals | — | — | — | $4,109 | $4,109 | — | — | — | — | — | — | — | — | — | $5,465 | — | — | — | — | — | — | — | — | $5,465 | — |
| Traffic Signals - Flashing Yellow Arrows | LI-23-8 | TBD | Signals - Traffic Signals | — | — | — | $4,693 | $4,693 | — | — | — | — | — | — | — | — | — | $6,242 | — | — | — | — | — | — | — | — | $6,242 | — |
| Traffic Signals - Flashing Yellow Arrows | MP-23-2 | TBD | Signals - Traffic Signals | — | — | — | $2,103 | $2,103 | — | — | — | — | — | — | — | — | — | $2,797 | — | — | — | — | — | — | — | — | $2,797 | — |
| US 1 (PalmTran - Route 1) - ITS/TSMO Improvements | PAL0184 | Signals - Traffic Signals, TSMO | — | $1,143 | — | $7,430 | $8,573 | — | — | — | — | — | — | — | $1,520 | — | — | — | — | — | $11,961 | — | — | — | — | $13,482 | — | |
| US 1 at Glades Rd, NE 15th Ter, and NE 24th Ter | MP-20-3.B | 4481351 | Signals - Replace span wire traffic signals with mast arms and upgrade supporting infrastructure | — | $354 | — | $2,147 | $2,501 | — | — | — | $354 | — | $2,147 | — | — | — | — | — | — | — | — | — | — | — | — | $2,501 | — |
| US 1 at SE 1st St, 7th Ave N, 10th Ave N, 13th Ave N; Boynton Beach Blvd at US-1, Congress Ave, Seacrest Blvd, Miltary Trl, Hagen Ranch Rd; Congress Ave at Dolan Rd; Atlantic Ave at Hamlet Dr; Lake Ave at SR A1A (include w/ FM 4476631) | MP-20-2-4.C | 4481071 | Signals - Traffic Signal Modification | — | $637 | — | $5,725 | $6,362 | — | — | — | $637 | — | $5,725 | — | — | — | — | — | — | — | — | — | — | — | — | $6,362 | — |
| US 1 at Silver Beach Rd, Military at Investment Ln, Okeechobee at Quadrille Blvd, Lakeview Ave at Quadrille Blvd | MP-20-2-4.B | 4480731 | Signals - Traffic Signal Modification | — | $287 | — | $2,769 | $3,056 | — | — | — | $308 | — | $2,769 | — | — | — | — | — | — | — | — | — | — | — | — | $3,077 | — |
| FEC Railway Passenger Service from Broward County Line to Jupiter | TPA0001 | 4170317 | Transit - Commuter rail passenger service | $13,407 | $80,442 | — | $446,900 | $540,749 | $40,500 | — | $1,350 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,350 | $527,342 |
| Okeechobee Blvd (SR 704) (PalmTran - Routes 40/43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd | MP-18-1c | 4513801 | Transit - Corridor study | $2,000 | — | — | — | $2,000 | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — |
| Okeechobee Blvd (SR 704) (PalmTran - Routes 43) Transit Shelters from SR 7 to US-1; SR 7 Transit Shelters from Forest Hill Blvd to Okeechobee Blvd | MP-18-1b | 4417584 | Transit - Shelters | — | $900 | — | $5,000 | $5,900 | — | — | — | $900 | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,900 | — |
| PalmTran Countywide Bus Stop Improvements | LI-22-6 | 4507971 | Transit - Bus Stops | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — |
| PalmTran Electric Buses and PalmTran Maintenance Facility (Electronics Way) charging stations | LI-22-4 | 4507981 | Transit - Purchase 4 electric buses and install electric charging at maintenance facility | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — |
| Tri-Rail - Passenger Rail Cars | LI-20-2 | 4481031 | Transit - Purchase passenger rail cars | — | — | — | $15,000 | $15,000 | — | — | — | — | — | $15,000 | — | — | — | — | — | — | — | — | — | — | — | — | $15,000 | — |
| Tri-Rail - Passenger Rail Cars | LI-23-5 | TBD | Transit - Rail Rolling Stock | — | — | — | $5,000 | $5,000 | — | — | — | — | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | $5,000 | — |
| Tri-Rail on CSX/SFRC from Mangonia Park Station (45th St) to VA Hospital (Blue Heron Blvd) | SFRTA0008 | Transit - Commuter Rail | $2,000 | — | — | $111,000 | $113,000 | $4,937 | — | — | — | — | — | $2,660 | — | — | — | — | — | — | — | — | — | — | — | $2,660 | $111,000 | |
| US 1 (PalmTran - Route 1) - Enhanced transit shelters from Palmetto Park Rd to Northlake Blvd | MP-17-1b | 4464431 | Transit - Construct 14 enhanced transit shelters within existing ROW. | — | — | — | $7,430 | $7,430 | — | — | $1,513 | — | — | $5,917 | — | — | — | — | — | — | — | — | — | — | — | — | $7,430 | — |
| Beeline Hwy (SR 710) Lane Addition from Blue Heron Blvd to Northlake Blvd | 2045-SIS002 | 4192511 | Road Capacity - Lane Addition: 4L to 6L | — | $2,022 | $1,445 | $119,775 | $123,242 | — | $178,346 | — | $1 | $4 | $2,710 | — | — | — | — | — | — | — | — | — | — | — | — | $2,715 | — |
| I 95 Interchange Modification @ 10th Ave North | 2045-SIS003 | 4127331 | Road Capacity - Interchange Reconstruction: Diverging Diamond | — | $2,650 | $6,246 | $23,142 | $32,038 | — | $2,474 | — | $539 | $1,000 | — | — | — | — | $11,514 | — | — | — | — | — | — | — | — | $13,053 | — |
| I 95 Interchange Modification @ 45th St | 2045-SIS004 | 4365191 | Road Capacity - Interchange Reconstruction: Tight Diamond | — | $44 | $2,488 | — | $2,532 | — | $4,584 | — | $44 | $1,837 | $21,779 | — | — | — | — | — | — | — | — | — | — | — | — | $23,660 | — |
| I 95 Interchange Modification @ 6th Ave South | 2045-SIS005 | 4369631 | Road Capacity - Interchange Reconstruction: Lane Addition | — | — | $5,761 | $11,251 | $17,012 | — | $29,424 | — | — | $71 | $360 | — | — | — | — | — | — | — | — | — | — | — | — | $431 | — |
| I 95 Interchange Modification @ Belvedere Rd | FDOT0099 | 4427841 | Road Capacity - Interchange Modification | — | $3,630 | $6,348 | $40,726 | $50,704 | — | — | — | — | — | — | — | $4,828 | $8,443 | — | — | — | — | $65,569 | — | — | — | — | $78,840 | — |
| I 95 Interchange Modification @ Boynton Beach Blvd | FDOT0133 | 4358041 | Road Capacity - Interchange Modification | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
| I 95 Interchange Modification @ Central Blvd | 2045-SIS008 | 4132651 | Road Capacity - Interchange Reconstruction: Tight Diamond | — | $4,475 | $9,081 | $63,038 | $76,594 | — | $10,821 | — | $6 | $5,049 | — | — | — | — | $116,403 | — | — | — | — | — | — | — | — | $121,458 | — |
| I 95 Interchange Modification @ Gateway Blvd | 2045-SIS009 | 2319321 | Road Capacity - Interchange Reconstruction: Single Point | — | $6,946 | $4,000 | $112,143 | $19,132 | — | $15,550 | — | $194 | $13,786 | $126,860 | — | — | — | — | — | — | — | — | — | — | — | — | $140,840 | — |
| I 95 Interchange Modification @ Hypoluxo Rd | 2045-SIS010 | 4132571 | Road Capacity - Interchange Reconstruction: Diverging Diamond | — | — | — | — | — | — | $8,448 | — | $66 | $3,863 | — | — | — | — | $102,997 | — | — | — | — | — | — | — | — | $106,926 | — |
| I 95 Interchange Modification @ Lantana Rd | 2045-SIS012 | 4132581 | Road Capacity - Interchange Reconstruction: Diverging Diamond | — | $51 | $14,134 | $61,279 | $75,464 | — | — | — | $51 | $14,134 | $61,279 | — | — | — | — | — | — | — | — | — | — | — | — | $75,464 | — |
| I 95 Interchange Modification @ Linton Blvd | 2045-SIS013 | 4353841 | Road Capacity - Interchange Modification: Auxiliary Lanes | — | — | — | — | — | — | $3,410 | — | — | $1,248 | $65 | — | — | — | — | — | — | — | — | — | — | — | — | $1,313 | — |
| I 95 Interchange Modification @ Linton Blvd | 2045-SIS014 | 4353842 | Road Capacity - Interchange Reconstruction: Diverging Diamond | — | $618 | — | $17,669 | $18,287 | — | — | — | $618 | — | — | — | — | — | $26,103 | — | — | — | — | — | — | — | — | $26,721 | — |
| I 95 Interchange Modification @ Northlake Blvd | 2045-SIS015 | 4358031 | Road Capacity - Interchange Modification: Turn Lane Additions | — | — | — | — | — | — | $6,731 | — | $39 | $3,966 | $63,470 | — | — | — | — | — | — | — | — | — | — | — | — | $67,475 | — |
| I 95 Interchange Modification @ Palm Beach Lakes Blvd | 2045-SIS017 | 4132601 | Road Capacity - Interchange Modification: Turn Lane Additions | — | — | — | — | — | — | $2,068 | — | $153 | — | $91 | — | — | — | — | — | — | — | — | — | — | — | — | $244 | — |
| I 95 Interchange Modification @ Southern Blvd (SR 80) | 2045-SIS019 | 4355161 | Road Capacity - Interchange Resonstruction | — | — | — | — | — | — | — | — | $8,993 | — | — | — | — | $8,403 | — | — | — | — | — | — | — | — | — | $17,396 | — |
| I 95 Interchange Modification @ Woolbright Rd | 2045-SIS020 | 4372791 | Road Capacity - Interchange Modification: Turn Lane Additions | — | — | — | — | — | — | $3,909 | — | $109 | $241 | $26,815 | — | — | — | — | — | — | — | — | — | — | — | — | $27,165 | — |
| I 95 Managed Lanes from 6th Ave S to North of Okeechobee Blvd | FDOT0100 | 4442022 | Road Capacity - Lane Addition: 4L Managed | $253 | $83,956 | $2,484 | $941,988 | $1,028,681 | — | $3,519 | $253 | — | — | — | — | — | — | — | — | $135,169 | — | — | — | — | $4,968 | $1,883,976 | $2,024,367 | — |
| I 95 Managed Lanes from Indiantown Rd to Martin County Line | FDOT0101 | 4132522 | Road Capacity - Lane Addition: 6L to 8L with Managed Lanes | $749 | $4,412 | — | $49,501 | $54,663 | — | $550 | $749 | — | — | — | — | — | — | — | — | — | — | — | — | $4,412 | — | — | $5,161 | $49,501 |
| I 95 Managed Lanes from Okeechobee Blvd to South of Indiantown Rd | FDOT0102 | 4442023 | Road Capacity - Lane Addition: 4L Managed | $3,000 | $36,225 | — | $406,449 | $445,674 | — | — | — | — | — | — | — | — | — | — | $3,000 | — | — | — | — | $36,225 | — | — | $39,225 | $406,449 |
| I 95 Managed Lanes from South of Linton Blvd to 6th Ave S | FDOT0103 | 4442021 | Road Capacity - Lane Addition: 4 Managed | $1,047 | $33,646 | — | $377,508 | $412,201 | — | — | $1,047 | — | — | — | — | — | — | — | — | $54,170 | — | — | — | — | — | $755,016 | $810,233 | — |
| Indiantown Rd (SR 706) WB Auxiliary Lane at Central Blvd | FDOT0134 | 454564 | Add WB auxiliary lane | — | $600 | — | $4,105 | $4,705 | — | — | — | $600 | — | $4,105 | — | — | — | — | — | — | — | — | — | — | — | — | $4,705 | — |
| Southern Blvd (SR 80) Highway Capacity from West of Royal Palm Beach Blvd to I 95 | FDOT0106 | 4451991 | Highway Capacity - Multimodal | $3,000 | $162,000 | $98,677 | $1,817,642 | $2,081,319 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,000 | — | — | — | $6,000 | $2,078,319 |
| Southern Blvd (SR 80) Intersection Improvements @ Jog Rd | 2045-SIS039 | 4512241 | Road Capacity - Interchange Modification: Lane Addition - Left Turn Lane | — | $38 | $10 | $2,315 | $2,362 | — | $491 | — | $38 | $10 | $2,315 | — | — | — | — | — | — | — | — | — | — | — | — | $2,362 | — |
| Southern Blvd (SR 80) Intersection Improvements @ SR 7 | 2045-SIS028 | 4378681 | Road Capacity - Interchange Modification: Lane Addition - Turn Lanes | — | $5 | $408 | $9,555 | $9,968 | — | $1,507 | — | $5 | $408 | $9,576 | — | — | — | — | — | — | — | — | — | — | — | — | $9,989 | — |
| Southern Blvd (SR 80) Highway Capacity from West of Binks Forest Drive to West of Royal Palm Beach Blvd | FDOT0104 | 4427831 | Highway Capacity - Multimodal (potentially widen 6L to 8L) | $1,500 | $2,587 | $37,377 | $29,021 | $70,485 | — | — | — | — | — | — | — | — | — | — | $2,415 | — | — | — | — | $5,173 | $37,377 | — | $44,965 | $29,021 |
| Turnpike Interchange Consruction @ Hypoluxo Rd | TPKE0015 | 4397411 | Road Capacity - New Interchange | — | — | — | $2,000 | $2,000 | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | $2,000 |
| Turnpike Lane Addition from Beeline Hwy to PGA Blvd | TPKE0009 | 4157481 | Road Capacity - Lane Addition: 4L to 8L, includes Beeline Hwy and PGA Blvd interchanges | — | — | $5,232 | $224,115 | $229,347 | — | — | — | $600 | $5,232 | $224,115 | — | — | — | — | — | — | — | — | — | — | — | — | $229,947 | — |
| Turnpike Lane Addition from Broward County Line to North of Glades Rd | TPKE0001 | 4182145 | Road Capacity - Lane Addition and TSM&O: Auxiliary Lanes | — | — | — | $97,042 | $97,042 | — | — | — | — | — | $151,814 | — | — | — | — | — | — | — | — | — | — | — | — | $151,814 | — |
| Turnpike Lane Addition from North of Atlantic Ave to North of L-30 Canal | TPKE0004 | 4371691 | Road Capacity - Lane Addition: 6L to 10 L w/ Thru Lanes | — | $2,747 | $7,355 | $104,140 | $114,242 | — | $9,965 | — | $2,747 | $7,355 | — | — | — | — | $138,506 | — | — | — | — | — | — | — | — | $148,608 | — |
| Turnpike Lane Addition from North of Boynton Beach Blvd to Southern Blvd | TPKE0006 | 4061435 | Road Capacity - Lane Addition: 4L to 6L | — | — | — | $280,995 | $280,995 | — | $306,917 | — | — | — | $4,300 | — | — | — | — | — | — | — | — | — | — | — | — | $4,300 | — |
| Turnpike Lane Addition from North of Glades Rd to North of L-38 Canal | TPKE0002 | 4171321 | Road Capacity - Lane Addition: 6L to 10L w/ Thru Lanes | — | — | $574 | $272,932 | $273,506 | — | — | — | $8,000 | $574 | $250,364 | — | — | — | — | — | — | — | — | — | — | — | — | $258,938 | — |
| Turnpike Lane Addition from North of L-30 Canal to North of Boynton Beach Blvd | TPKE0005 | 4371694 | Road Capacity - Lane Addition: 6L to 10L w/ Thru Lanes, includes Boynton Beach Blvd interchange | — | $2,977 | — | $105,312 | $108,289 | — | — | — | $2,977 | — | — | — | — | — | $140,065 | — | — | — | — | — | — | — | — | $143,042 | — |
| Turnpike Lane Addition from North of L-38 Canal to North of Atlantic Ave | TPKE0003 | 4171324 | Road Capacity - Lane Addition: 6L to 10 L w/ Thru Lanes, includes Atlantic Ave interchange | — | $4,650 | — | $129,701 | $134,351 | — | — | — | $4,650 | — | $129,701 | — | — | — | — | — | — | — | — | — | — | — | — | $134,351 | — |
| Turnpike Lane Addition from North of Okeechobee Blvd to Beeline Hwy | TPKE0008 | 4061436 | Road Capacity - Lane Addition: 4L to 8L | — | — | — | $134,452 | $134,452 | — | $10,162 | — | $600 | — | $134,452 | — | — | — | — | — | — | — | — | — | — | — | — | $135,052 | — |
| Turnpike Lane Addition from Indiantown Rd to Martin County Line | TPKE0013 | 4462181 | Road Capacity - Lane Addition: 4L to 6L | — | — | — | $2,007 | $2,007 | — | — | $2,007 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,007 | $2,007 |
| Turnpike Lane Addition from Southern Blvd to Okeechobee Blvd | TPKE0007 | 4061438 | Road Capacity - Lane Addition: 4L to 8L , includes Jog Rd and Okeechobee Blvd interchanges | — | — | — | $263,712 | $263,712 | — | $438 | — | — | — | $263,712 | — | — | — | — | — | — | — | — | — | — | — | — | $263,712 | — |
| Turnpike Lane Addition from North of PGA Blvd to North of Indiantown Rd | TPKE0010 | 4157484 | Road Capacity - Lane Addition: 4L to 8 L, includes Indiantown Rd interchange | — | $500 | — | $350,729 | $351,229 | — | — | — | $500 | — | — | — | — | — | $466,470 | — | — | — | — | — | — | — | — | $466,970 | — |
| US 27 Freight Capacity from Broward County Line to Evercane Rd (Hendry County) | 2045-SIS034 | Freight - Capacity | $2,000 | $39,341 | $16,189 | $413,075 | $470,606 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | — | — | $2,000 | $468,606 | |
| Beeline Hwy (SR 710) ITS from Blue Heron Blvd to Congress Ave | 2045-SIS001 | TBD | Signals - Intersection & TSMO Improvements | — | $1,295 | — | $13,014 | $14,309 | — | — | — | — | — | — | — | $1,722 | — | — | — | — | — | $20,953 | — | — | — | — | $22,675 | — |
| Beeline Hwy (SR 710) ITS from Congress Ave to Martin County Line | SIS0004 | Signals - TSMO | — | $2,300 | — | — | $2,300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,600 | — | — | $4,600 | — | |
| Southern Blvd (SR 80) ITS from US 27 to I 95 | FDOT0105 | 4480121 | Intelligent Transportation System - Corridor Management | — | $1,576 | — | $17,687 | $19,263 | — | — | — | — | — | — | — | $1,576 | — | — | — | — | — | — | — | — | — | $37,107 | $38,683 | — |
| US 27 ITS from Broward County Line to South of SW 2nd St (South Bay) | FDOT0107 | 4462341 | ITS retrofit | — | $819 | — | $9,456 | $10,274 | — | — | — | — | — | — | — | — | — | — | — | $820 | — | — | — | — | — | $19,838 | $20,658 | — |
| US 27 ITS from Krome Ave (Miami-Dade County) to Evercane Rd (Hendry County) | FDOT0108 | ITS Corridor Management - TSMO | $2,217 | — | — | $25,612 | $27,829 | — | — | — | — | — | — | — | — | — | — | $2,217 | — | — | — | — | — | — | $53,733 | $55,950 | — | |
| A1A SUN Trail from Camino Real to Beach Club Way | SUN-2023.B | TBD | Complete Streets - Feasibility Study, design, pedestrian Bridge | $3,000 | — | — | — | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 |
| Boca Brightline Station Area Pedestrian and Bicycle Acccess Improvements | BOC0007 | Complete Streets - Area Study | $268 | $1,608 | — | $10,454 | $12,331 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $12,331 | |
| Boca Street Light Design | BOC0047 | Complete Streets - Lighting | $19 | $112 | — | $730 | $861 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $861 | |
| C-8 Canal Trail from Stribling Way to Lake Worth Rd | WEL0001 | Complete Streets - Shared use path | — | — | — | $790 | $790 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $790 | |
| Central Blvd Complete Street from 117th Ct N to Donald Ross Rd | PBG0017 | Complete Streets - Sidewalk widening. The City is also supportive of a 8’ pathway on the W side of the road, in addition to the East side already noted. | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Clear Lake Path Extension from current boardwalk to Banyan Blvd | WPB0057 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Delray Downtown Bicycle Boulevards | DEL0002 | Complete Streets - Bicycle Route, sharrows, bicycle boulevard | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Downtown Walkability Study Implementation | BOC0027 | Complete Streets - Area study | $1,404 | $8,423 | — | $54,751 | $64,579 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $64,579 | |
| El Rio Trail South Extension | BOC0020 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| M Canal Trail from Jog Rd to downtown West Palm Beach | ROY0003 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Old Dixie Hwy from NE 5th Ave to City of Boynton Beach | DEL0005 | Complete Streets - Complete Streets Study | — | — | — | $10,000 | $10,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $10,000 | |
| RCA Blvd Complete Street & Intersection from Design Center Dr to Prosperity Farms Rd | PBG0005 | Complete Streets - Road capacity, median, roundabout, turn lanes, side paths, trails, bicycle lanes. The City would like to include a roundabout to the scope of this project or as a separate project. | $118 | $708 | — | $4,600 | $5,426 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,426 | |
| South Shore Blvd Trail from Lake Worth Rd to 50th Street | WEL0002 | Complete Streets - Shared use path | — | — | — | $990 | $990 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $990 | |
| SUN Trail along SR 80 | TPA0013 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| SUN Trail North- South along Atlantic Coast | TPA0012 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Tamarind Ave from Banyan Blvd to N Sapodilla Rail to Trail | WPB0006 | Complete Streets - Shared use path | — | — | — | $270 | $270 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $270 | |
| West Palm Beach Greenway Project South | WPB0047 | Complete Streets - Shared use path | — | — | — | $5,000 | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | |
| US 1 SUN Trail from Indiantown Rd to Loxahatchee River | SUN-2023.A | TBD | Complete Streets - Shared use path | $7,147 | — | — | — | $7,147 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $7,147 |
| Boca Brightline Station Pedestrian Overpass to Mizner Park | BOC0003 | Grade Separation - Grade Separation: Ped/Bike | $285 | $1,710 | — | $11,115 | $13,110 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $13,110 | |
| El Rio Trail Bridge between Glades Road and 20th Street | BOC0041 | Grade Separation - Grade separated pedestrian bridge | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| El Rio Trail Grade Separation at Spanish River Boulevard | BOC0001 | Grade Separation - Grade separated pedestrian bridge | $150 | $900 | — | $5,850 | $6,900 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,900 | |
| I 95 Pedestrian Bridge connecting NW 13th St and the Shops at Boca Center | BOC0021 | Grade Separation - Grade Separation: Ped/Bike | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Tri-Rail Boca Raton Station - Electric Vehicle Charging | SFRTA0014 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Boynton Beach Station - Electric Vehicle Charging | SFRTA0012 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Delray Beach Station - Electric Vehicle Charging | SFRTA0013 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Lake Worth Beach Station - Electric Vehicle Charging | SFRTA0011 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Mangonia Park Station - Electric Vehicle Charging | SFRTA0009 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail West Palm Beach Station - Electric Vehicle Charging | SFRTA0010 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| 120th Ave @ Lake Worth Road roundabout | WEL0003 | "Road Capacity - Construct a 2x1 Roundabout " | — | — | — | $3,000 | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 | |
| Fern St Road Extension from Australian Ave to Tamarind Ave | WPB0005 | Complete Streets - Street extension, new RR crosswalks, separated bicycle lanes, trail crosswalks | $6,262 | $37,573 | — | $244,227 | $288,063 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $288,063 | |
| Government Center Roads from PGA Blvd to Fairchild Avenue road construction | PBG0004 | Road Capacity - 2L Road, sidewalks, bicycle lanes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Greenview Shores Blvd Corridor Roundabouts (@ Paddock Drive, Foresteria Ave, & Meadow Ave) | WEL0012 | Road Capacity - Corridor intersection analysis, roundabouts | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Indiantown Rd (SR 706) PD&E Study from Central Blvd to Maplewood Dr | JPT0004 | Road Capacity - PDE to relieve congestion | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Jeffery St Road Extension from 2nd Ave to Federal Hwy | BOC0013 | Road Capacity - 2L Road, RR crossing | $52 | $314 | — | $1,742 | $2,108 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,108 | |
| 10th Ave N ITS from Kirk Rd to I 95 | FDOT0109 | Signals - TSMO | — | $437 | — | $2,840 | $3,277 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,277 | |
| 45th St ITS from N Congress Ave to Greenwood Ave | FDOT0110 | Signals - TSMO | — | $318 | — | $2,068 | $2,386 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,386 | |
TPA Priorities — Illustrative Projects
| Project Information | Present Day Costs FY24 (in thousands) | Previous | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | CF Total | Unfunded | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project Name | LRTP # | FM # | Description | PDE | PE | ROW | CST | Total | O&M | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | |||
| Atlantic Ave (PalmTran - Route 81) - TSMO Improvements | PAL0216 | Signals - Traffic signals, TSMO | — | $2,970 | — | $19,305 | $22,275 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $22,275 | |
| Atlantic Ave (SR 806) ITS from Congress Ave to Swinton Ave | FDOT0111 | Signals - Traffic Signals, TSMO | — | $232 | — | $1,508 | $1,741 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,741 | |
| Banyan Blvd ITS from Australian Ave to N Flagler Dr | FDOT0112 | Signals - TSMO | — | $182 | — | $1,186 | $1,369 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,369 | |
| Blue Heron Blvd (SR 708) ITS from Military Trail to Old Dixie Hwy | FDOT0113 | Signals - Traffic Signals, TSMO | — | $457 | — | $2,971 | $3,428 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,428 | |
| Boca TMC Adaptive Traffic Control Upgrade | BOC0056 | Signals - Facilities Development, TSMO | $54 | $327 | — | $2,123 | $2,504 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,504 | |
| Boynton Beach Blvd (PalmTran - Route 73) - TSMO Improvements | PAL0213 | Signals - Traffic Signals, TSMO | — | $2,610 | — | $16,965 | $19,575 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $19,575 | |
| Congress Ave (SR 807) Congress Ave ITS from Southern Blvd to Yamato Rd | FDOT0114 | Signals - Traffic Signals, TSMO | — | $3,616 | — | $23,506 | $27,122 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $27,122 | |
| Dixie Hwy (SR 811) ITS from Yamato Rd to Royal Palm Way | FDOT0115 | Signals - Traffic Signals, TSMO | — | $815 | — | $5,297 | $6,112 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,112 | |
| Lake Worth Rd (SR 802) Lake Worth Rd ITS from SR 7 to I 95 | FDOT0117 | Signals - Traffic Signals, TSMO | — | $1,561 | — | $10,147 | $11,708 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $11,708 | |
| Lantana Rd ITS from High Ridge Rd to I 95 | FDOT0118 | Signals - TSMO | — | $72 | — | $471 | $543 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $543 | |
| Military Trl (SR 809) ITS from Lake Worth Rd to Atlantic Ave | FDOT0119 | Signals - Traffic Signals, TSMO | — | $2,026 | — | $13,167 | $15,192 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $15,192 | |
| Military Trl (SR 809) ITS from Lake Worth Rd to Hypoluxo Rd | FDOT0120 | Signals - Traffic Signals, TSMO | — | $577 | — | $3,754 | $4,331 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,331 | |
| Military Trl (SR 809) ITS from Yamato Rd to Town Center Cir | FDOT0121 | Signals - Traffic Signals, TSMO | — | $412 | — | $2,677 | $3,089 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,089 | |
| Okeechobee Blvd (PalmTran - Route 43) - ITS/TSMO Improvements | PLMT0119 | Signals - TSMO | — | $315 | — | $2,048 | $2,363 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,363 | |
| PalmTran - Route 81 - TSMO Improvements | PLMT0138 | Signals - TSMO | — | $297 | — | $1,931 | $2,228 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,861 | $3,861 | $297 | |
| PGA Blvd (SR 876) ITS from FL Turnpike to Central Blvd | FDOT0124 | Signals - Traffic Signals, TSMO | — | — | — | $300 | $300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $300 | |
| Signals | FDOT0116 | Signals - Traffic Signals, TSMO | — | $726 | — | $4,721 | $5,447 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,447 | |
| US 1 ITS from Lake Ave to N Federal Hwy | FDOT0122 | Signals - Traffic Signals, TSMO | — | $763 | — | $4,960 | $5,723 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,723 | |
| US 1 ITS from Northlake Blvd to N Quadrille Blvd and from Southern Blvd to Lucerne Ave | FDOT0123 | Signals - Traffic Signals, TSMO | — | $2,032 | — | $13,208 | $15,240 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $15,240 | |
| Atlantic Ave (PalmTran - Route 81) - Enhanced Transit from Military Trl to US 1 | TPA0010 | Transit - Fixed Guideway | $3,885 | $15,860 | — | $85,988 | $105,733 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $105,733 | |
| Atlantic Ave (PalmTran - Route 81) - Weekday service frequency | PLMT0068 | Transit - Capital to support enhanced service | $1,332 | $5,438 | — | $29,482 | $36,251 | $967 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $36,251 | |
| Boca Raton - Trolleys | BOC0049 | Transit - Rolling Stock | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Boynton Beach Blvd (PalmTran - Route 73) - Bus Stop Improvements | PLMT0176 | Transit - Transit Stops | $60 | $359 | — | $2,331 | $2,750 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,750 | |
| Boynton Beach Blvd (PalmTran - Route 73) - Enhanced Transit from Military Trl to US 1 | TPA0009 | Transit - Fixed Guideway | $984 | $4,017 | — | $21,779 | $26,780 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $26,780 | |
| Boynton Beach Blvd (PalmTran - Route 73) - Weekday service frequency | PLMT0062 | Transit - Capital to support enhanced service | $295 | $1,205 | — | $6,534 | $8,034 | $1,179 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $8,034 | |
| Congress Ave (PalmTran - Route 2) - Bus Stop Improvements | PLMT0148 | Transit - Bus Stops | $17 | $101 | — | $658 | $776 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $776 | |
| Congress Ave (PalmTran - Route 2) - Weekday service frequency | PLMT0004 | Transit - Capital to support enhanced service | $882 | $3,601 | — | $19,522 | $24,004 | $3,800 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $24,004 | |
| Congress Ave (PalmTran - Route 2) Enhanced Transit Vision from Yamato Rd to Intermodal Center | TPA0004 | Transit - Fixed Guideway | $5,880 | $24,004 | — | $130,144 | $160,028 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $160,028 | |
| FEC Palm Beach Gardens Passenger Rail Station | PBG0003 | Transit - Passenger Rail Station | $1,000 | $1,000 | $4,000 | $14,965 | $20,965 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $20,965 | |
| FEC Railway Crossing Safety Improvements | FDOT0132 | Transit - 44 RR Crossings | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Forest Hill Blvd (PalmTran - Route 46) - Bus Stop Improvements | PLMT0163 | Transit - Bus Stops | $667 | $4,000 | — | $26,003 | $30,670 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $30,670 | |
| Forest Hill Blvd (PalmTran - Route 46) - Weekday service frequency | PLMT0039 | Transit - Capital to support enhanced service | $900 | $3,674 | — | $19,920 | $24,494 | $1,613 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $24,494 | |
| Forest Hill Blvd (PalmTran - Route 46) Enhanced Transit from SR 7 to US 1 | TPA0007 | Transit - Fixed Guideway | $2,625 | $10,716 | — | $58,100 | $71,441 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $71,441 | |
| Glades Rd - Route 92 - Weekday service frequency | PLMT0077 | Transit - Capital to support enhanced service | $670 | $2,734 | — | $14,820 | $18,224 | $1,309 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $18,224 | |
| Glades Rd (PalmTran - Route 91) Enhanced Transit from Butts Rd to US 1 | TPA0011 | Transit - Fixed Guideway | $2,232 | $9,112 | — | $49,401 | $60,745 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $60,745 | |
| Lake Worth Rd (PalmTran - Route 62) - Bus Stop Improvements | PLMT0170 | Transit - Bus Stops | $812 | $4,874 | — | $31,682 | $37,368 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $37,368 | |
| Lake Worth Rd (PalmTran - Route 62) - Weekday service frequency | PLMT0052 | Transit - Capital to support enhanced service | $400 | $1,631 | — | $8,844 | $10,875 | $1,527 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $10,875 | |
| Lake Worth Rd Enhanced Transit from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd | TPA0008 | TBD | Transit - Fixed Guideway | $3,960 | $23,760 | — | $132,000 | $159,720 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $159,720 |
| Military Trl (SR 809)(PalmTran - Route 3) - Bus Stop Improvements | PLMT0149 | Transit - Bus Stops | $24 | $143 | — | $933 | $1,100 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,100 | |
| Military Trl (SR 809) (PalmTran - Route 3) - Enhanced Transit from Glades Rd to PGA Blvd | TPA0005 | Transit - Fixed Guideway | $8,088 | $33,018 | — | $179,014 | $220,120 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $220,120 | |
| Militray Trl (PalmTran - Route 3) - Weekday service frequency | PLMT0007 | Transit - Capital to support enhanced service | $2,426 | $9,905 | — | $53,704 | $66,036 | $5,333 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $66,036 | |
| Okeechobee Blvd (PalmTran - Route 43) - Bus Stop Improvements | PLMT0158 | Transit - Bus Stops | $720 | $4,322 | — | $28,095 | $33,138 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $33,138 | |
| Okeechobee Blvd (SR 704)(PalmTran - Routes 43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd | TPA0006 | See FDOT0070 | Transit - Fixed Guideway | $56,990 | $341,938 | — | $1,500,727 | $1,899,655 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,899,655 |
| PalmTran - Route 43 - Weekday service frequency | PLMT0032 | Transit - Capital to support enhanced service | — | — | — | $1,600 | $1,600 | $1,390 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,600 | |
| PalmTran - Route 81 - Bus Stop Improvements | PLMT0179 | Transit - Bus Stops | $713 | $4,276 | — | $27,796 | $32,785 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $32,785 | |
| PalmTran - Route 94 - Bus Stop Improvements | PLMT0184 | Transit - Bus Stops | $284 | $1,701 | — | $11,059 | $13,044 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $13,044 | |
| PalmTran - Route x999x - Express Bus from Belle Glade to WPB via SR 80 | PLMT0225 | Transit - Capital to support enhanced service | — | — | — | $5,600 | $5,600 | $1,711 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,600 | |
| PalmTran - Route x999x - Express Bus from Broward County Line to Okeechobee Blvd via SR-7 | PLMT0226 | Transit - Capital to support enhanced service | — | — | — | $5,600 | $5,600 | $1,553 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,600 | |
| PalmTran - Route x999x - Express Bus from Westlake to WPB via Northlake Blvd | PLMT0223 | Transit - Capital to support enhanced service | — | — | — | $3,200 | $3,200 | $939 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,200 | |
| PalmTran - Route x999x - Express Bus from Westlake to WPB via Okeechobee Blvd | PLMT0224 | Transit - Capital to support enhanced service | — | — | — | $3,200 | $3,200 | $756 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,200 | |
| PalmTran Rolling Stock Coaches for Express Routes | PLMT0104 | Transit - Rolling Stock | $15 | $89 | — | $580 | $3,200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $685 | |
| PalmTran Rolling Stock Low Floor Buses | PLMT0103 | Transit - Rolling Stock | $465 | $2,791 | — | $18,140 | $100,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $21,395 | |
| Patch Reef Trail from Verde Trail to Sugar Sand Park | BOC0035 | Transit - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| SFRC Fiber Communication | SFRTA0001 | Transit - Rail, Utilities | — | — | — | $16,000 | $16,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $16,000 | |
| SFRC Grade Crossings and Signals - Signal Safety Improvements | SFRTA0002 | Transit - Rail, Utilities | — | — | — | $17,000 | $17,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $17,000 | |
| SFRC System Control Points Replacement in Palm Beach County | SFRTA0007 | Transit - Rail, Control signals | — | — | — | $24,000 | $24,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $24,000 | |
| SFRC Wood Tie Conversion to Concrete | SFRTA0004 | Transit - Rail, Maintenance | — | — | — | $25,000 | $25,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $25,000 | |
| Tri-Rail New Automated Fare Collection System (AFCS) | SFRTA0003 | Transit - Regional Farebox System | — | — | — | $12,000 | $12,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $12,000 | |
| Tri-Rail Positive Train Control (PTC) | SFRTA0005 | Transit - Rail Control System | — | — | — | $20,000 | $20,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $20,000 | |
| Tri-Rail Rolling Stock Remaining Vehicle Replacement and Service Expansion | SFRTA0006 | Transit - Rail Rolling Stock | — | — | — | $52,400 | $52,400 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $52,400 | |
| US 1 (PalmTran - Route 1) - Bus Stop Improvements | PLMT0147 | Transit - Bus Stops | $29 | $172 | — | $1,118 | $1,318 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,318 | |
| US 1 (PalmTran - Route 1) Enhanced Transit from Camino Real to Indiantown Rd | TPA0003 | TBD | Transit - Fixed Guideway | $4,893 | $29,358 | — | $163,098 | $197,349 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $197,349 |
| West Palm Beach Blue Trolley Route ITS/TSMO improvements | WPB0065 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||
| West Palm Beach Blue Trolley Route Transit stop improvements | WPB0064 | Transit - Bus Stops | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| West Palm Beach Transit Fleet replacement | WPB0046 | Transit - Rolling Stock | $420 | $2,520 | — | $16,380 | $19,320 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $19,320 | |
| Tri-Rail Boynton Beach Station - Electric Vehicle Charging | SFRTA0012 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Delray Beach Station - Electric Vehicle Charging | SFRTA0013 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| Tri-Rail Boca Raton Station - Electric Vehicle Charging | SFRTA0014 | Resilience - EV Charging Stations | — | — | — | $945 | $945 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $945 | |
| US 1 SUN Trail from Indiantown Rd to Loxahatchee River | SUN-2023.A | TBD | Complete Streets - Shared use path | $7,147 | — | — | — | $7,147 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $7,147 |
| A1A SUN Trail from Camino Real to Beach Club Way | SUN-2023.B | TBD | Complete Streets - Feasibility Study, design, pedestrian Bridge | $3,000 | — | — | — | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 |
| US 1 (PalmTran - Route 1) Enhanced Transit from Camino Real to Indiantown Rd | TPA0003 | TBD | Transit - Fixed Guideway | $4,893 | $29,358 | — | $163,098 | $197,349 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $197,349 |
| Congress Ave (PalmTran - Route 2) Enhanced Transit Vision from Yamato Rd to Intermodal Center | TPA0004 | Transit - Fixed Guideway | $5,880 | $24,004 | — | $130,144 | $160,028 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $160,028 | |
| Military Trl (SR 809) (PalmTran - Route 3) - Enhanced Transit from Glades Rd to PGA Blvd | TPA0005 | Transit - Fixed Guideway | $8,088 | $33,018 | — | $179,014 | $220,120 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $220,120 | |
| Okeechobee Blvd (SR 704)(PalmTran - Routes 43) Enhanced Transit from SR 7 to US 1 and SR 7 from Forest Hill Blvd to Okeechobee Blvd | TPA0006 | See FDOT0070 | Transit - Fixed Guideway | $56,990 | $341,938 | — | $1,500,727 | $1,899,655 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,899,655 |
| Forest Hill Blvd (PalmTran - Route 46) Enhanced Transit from SR 7 to US 1 | TPA0007 | Transit - Fixed Guideway | $2,625 | $10,716 | — | $58,100 | $71,441 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $71,441 | |
| Lake Worth Rd Enhanced Transit from SR 7 to US 1 and SR 7 from Lake Worth Rd to Forest Hill Blvd | TPA0008 | TBD | Transit - Fixed Guideway | $3,960 | $23,760 | — | $132,000 | $159,720 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $159,720 |
| Boynton Beach Blvd (PalmTran - Route 73) - Enhanced Transit from Military Trl to US 1 | TPA0009 | Transit - Fixed Guideway | $984 | $4,017 | — | $21,779 | $26,780 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $26,780 | |
| Atlantic Ave (PalmTran - Route 81) - Enhanced Transit from Military Trl to US 1 | TPA0010 | Transit - Fixed Guideway | $3,885 | $15,860 | — | $85,988 | $105,733 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $105,733 | |
| Glades Rd (PalmTran - Route 91) Enhanced Transit from Butts Rd to US 1 | TPA0011 | Transit - Fixed Guideway | $2,232 | $9,112 | — | $49,401 | $60,745 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $60,745 | |
| SUN Trail North- South along Atlantic Coast | TPA0012 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| SUN Trail along SR 80 | TPA0013 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Okeechobee Gateway from West of Australian Ave to the ICWW | TPA0014 | Complete Streets - Corridor Study | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| C-8 Canal Trail from Stribling Way to Lake Worth Rd | WEL0001 | Complete Streets - Shared use path | — | — | — | $790 | $790 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $790 | |
| South Shore Blvd Trail from Lake Worth Rd to 50th Street | WEL0002 | Complete Streets - Shared use path | — | — | — | $990 | $990 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $990 | |
| Greenview Shores Blvd Corridor Roundabouts (@ Paddock Drive, Foresteria Ave, & Meadow Ave) | WEL0012 | Road Capacity - Corridor intersection analysis, roundabouts | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| Fern St Road Extension from Australian Ave to Tamarind Ave | WPB0005 | Complete Streets - Street extension, new RR crosswalks, separated bicycle lanes, trail crosswalks | $6,262 | $37,573 | — | $244,227 | $288,063 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $288,063 | |
| Tamarind Ave from Banyan Blvd to N Sapodilla Rail to Trail | WPB0006 | Complete Streets - Shared use path | — | — | — | $270 | $270 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $270 | |
| West Palm Beach Transit Fleet replacement | WPB0046 | Transit - Rolling Stock | $420 | $2,520 | — | $16,380 | $19,320 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $19,320 | |
| West Palm Beach Greenway Project South | WPB0047 | Complete Streets - Shared use path | — | — | — | $5,000 | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | |
| Clearlake Multipurpose Path | WPB0057 | Complete Streets - Shared use path | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| West Palm Beach Blue Trolley Route Transit stop improvements | WPB0064 | Transit - Bus Stops | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | |
| West Palm Beach Blue Trolley Route ITS/TSMO improvements | WPB0065 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | ||
Maintenance Projects
| Project Information | Present Day Costs FY24 (in thousands) | Previous | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | CF Total | Unfunded | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project Name | LRTP # | FM # | Description | PDE | PE | ROW | CST | Total | O&M | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | |||
| Barwick Rd over LWDD L-30 Canal bridge repairs | PAL0165 | 2022801 | Bridge Reconstruction - Replace bridge | — | — | — | $2,000 | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 |
| Belvedere Rd over LWDD E-3 Canal bridge repairs | PAL0166 | 2018801 | Bridge Reconstruction - Bridge Replacement, 5 L w/ buffered bike lanes & dedicated right turn lane. | — | — | — | $3,000 | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 |
| Congress Ave over L-2 Canal bridge repairs | PAL0167 | 2019802 | Bridge Reconstruction - Replace bridge with culvert | — | — | — | $1,500 | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 |
| Congress Ave over SFRTA Rail bridge repairs | PAL0161 | 2021610 | Bridge Reconstruction - Bridge repairs | — | — | — | $500 | $500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $500 |
| Coral Drive over Subdivision Canal Bridge Replacement | FDOT0001 | Bridge Reconstruction - Bridge Reconstruction | — | — | — | $800 | $800 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $800 | |
| CR 880 (Sam Senter Rd) over SFWMD Ocean Canal bridge repairs | PAL0170 | 2019803 | Bridge Reconstruction - Bridge Reconstruction | — | — | — | $9,300 | $9,300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $9,300 |
| CR-707/Beach Road over ICWW Bridge Replacement | FDOT0003 | Bridge Reconstruction - Bridge Reconstruction (#930026) | — | — | — | $59,600 | $59,600 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $59,600 | |
| CR-880 over C-51 Canal Bridge Replacement | FDOT0004 | Bridge Reconstruction - Bridge Reconstruction (#930940) | — | — | — | $7,000 | $7,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $7,000 | |
| Duda Rd over L-14 Canal bridge repairs | PAL0171 | 2023801 | Bridge Reconstruction - Replace to a 3 span bridge | — | — | — | $4,250 | $4,250 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,250 |
| E Ocean Ave over Hypoluxo Island bridge repairs | PAL0172 | 2023800 | Bridge Reconstruction - Replace bridge | — | — | — | $600 | $600 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $600 |
| E. Camino Real over ICWW Bridge Replacement | FDOT0005 | Bridge Reconstruction - Bridge Reconstruction (#934408) | — | — | — | $22,500 | $22,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $22,500 | |
| Florida Mango Rd over L-2 Canal bridge repairs | PAL0173 | 2017512 | Bridge Reconstruction - Replace existing Bridge with twin RCP pipes | — | — | — | $817 | $817 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $817 |
| Florida Mango Rd over L-5 Canal bridge replacement | PAL0179 | 2015523 | Bridge Reconstruction - Replace existing bridge with concrete box culvert | — | — | — | $1,300 | $1,300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,300 |
| G Bush Blvd (NE 8th) over ICWW bridge replacement | PAL0174 | 2022506 | Bridge Reconstruction - Reconstruct existing bascule bridge | — | — | — | $70,000 | $70,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $70,000 |
| Jupiter Beach Rd over Branch of ICWW bridge replacement | PAL0175 | 2021803 | Bridge Reconstruction - Replace Bridge and reconstruct approaches | — | — | — | $2,300 | $2,300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,300 |
| Kirk Rd over L-11 Canal culvert replacement | PAL0183 | 2023502 | Bridge Reconstruction - Replace existing 60" CMP culvert. | — | — | — | $1,750 | $1,750 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,750 |
| Lake Osborne Dr over Lake Bass Canal bridge replacement | PAL0180 | 2017801 | Bridge Reconstruction - IST project requested by R&B to replace existing Bridge. Project includes ILA with Municipal of Lake Worth for utility relocation | — | — | — | $810 | $810 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $810 |
| Lighthouse Dr over North Plam Beach Waterway Bridge Replacement | FDOT0007 | Bridge Reconstruction - Bridge Reconstruction (#934408) | — | — | — | $4,500 | $4,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,500 | |
| Palm Beach Lakes Blvd over FEC Railroad bridge repairs | PAL0163 | 2017800 | Bridge Reconstruction - Widen and rehab bridge to add shoulders, barrier, & sidewalks | — | — | — | $20,000 | $20,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $20,000 |
| Palmetto Park Rd over ICWW bridge repairs | PAL0162 | 2013607 | Bridge Reconstruction - Bascule Bridge rehabilitation, painting and fender system repairs | — | — | — | $4,200 | $4,200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,200 |
| Prosperity Farms Rd over C-17 Canal bridge replacement | PAL0176 | 2018800 | Bridge Reconstruction - Replace and widen existing bridge | — | — | — | $8,400 | $8,400 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $8,400 |
| Smith Sundy Rd over L-33 Canal bridge replacement | PAL0177 | 2017514 | Bridge Reconstruction - Replace bridge | — | — | — | $2,100 | $2,100 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,100 |
| Spanish River Blvd over ICWW Bridge Replacement (WB & EB) | FDOT0013 | Bridge Reconstruction - Bridge Reconstruction (#930154 & 930226) | — | — | — | $91,800 | $91,800 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $91,800 | |
| SR 806 (Atlantic Ave) over ICWW Bridge Replacement | FDOT0008 | Bridge Reconstruction - Bridge Reconstruction (#930026) | — | — | — | $32,800 | $32,800 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $32,800 | |
| SR 811 (Alt. A1A) over Loxahatchee River Bridge Replacement | FDOT0009 | Bridge Reconstruction - Bridge Reconstruction (#930339) | — | — | — | $121,000 | $121,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $121,000 | |
| SR 876 (PGA Blvd) Bridge Replacement over ICWW | FDOT0012 | Bridge Reconstruction - Bridge Reconstruction (#930106 & 930349) | — | — | — | $96,000 | $96,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $96,000 | |
| SR A1A over Boca Inlet Bridge Replacement | FDOT0010 | Bridge Reconstruction - Bridge Reconstruction (#930060) | — | — | — | $55,500 | $55,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $55,500 | |
| Summit Blvd from west of C-51 Canal Crossing to I 95 lane addition | PAL0042 | Bridge Reconstruction - Replace bridge, add walls and railroad crossing improvement | — | — | — | $3,105 | $3,105 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $3,105 | |
| Summit Blvd over C-51 bridge replacement | PAL0178 | 2022803 | Bridge Reconstruction - Replace bridge | — | — | — | $11,000 | $11,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $11,000 |
| Torry Island Swing Bridge repairs | PAL0164 | 2020602 | Bridge Reconstruction - Study to repair the aging bridge superstructure. | — | — | — | $2,000 | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 |
| US 1 (Parker Blvd) over ICWW Bridge Replacement | FDOT0011 | Bridge Reconstruction - Bridge Reconstruction (#930004) | — | — | — | $76,800 | $76,800 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $76,800 | |
| Woolbright Rd over ICWW Bridge Replacement | FDOT0014 | Bridge Reconstruction - Bridge Reconstruction (#930214) | — | — | — | $42,600 | $42,600 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $42,600 | |
| Woolbright Rd over SE 15th Ave bascule bridge repairs | PAL0181 | 2023501 | Bridge Reconstruction - Bridge Reconstruction | — | — | — | $200 | $200 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $200 |
Airports and Seaports Projects
| Project Information | Present Day Costs FY24 (in thousands) | Previous | FY 25–29 | FY 30–35 | FY 36–40 | FY 41–50 | CF Total | Unfunded | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Project Name | LRTP # | FM # | Description | PDE | PE | ROW | CST | Total | O&M | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | PDE | PE | ROW | CST | |||
| Lantana Airport - Storm drainage & pavement | PORT0036 | Airport - Install storm drainage and pavement to areas currently without, port wide | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Lantana Airport - Airfield Pavement Maintenance | LNA0003 | Airport - Airfield Pavement Maintenance | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Lantana Airport - Automated Weather Observing System (AWOS) Replacement | LNA0001 | Airport - Automated Weather Observing System (AWOS) Replacement | — | — | — | $300 | $300 | — | — | — | — | — | $300 | — | — | — | — | — | — | — | — | — | — | — | — | $300 | — | |
| Lantana Airport - Runway 16-34 Rehabilitation | LNA0004 | Airport - Lantana Airport - Runway 16-34 Rehabilitation | — | — | — | $7,000 | $7,000 | — | — | — | — | — | $7,000 | — | — | — | — | — | — | — | — | — | — | — | — | $7,000 | — | |
| Lantana Airport - Southside Redevelopment | LNA0002 | Airport - Southside Redevelopment | — | — | — | $6,500 | $6,500 | — | — | — | — | — | $6,500 | — | — | — | — | — | — | — | — | — | — | — | — | $6,500 | — | |
| North Palm Beach County Airport - Air Traffic Control Tower | F450002 | Airport - Air Traffic Control Tower | — | — | — | $13,000 | $13,000 | — | — | — | — | — | $13,000 | — | — | — | — | — | — | — | — | — | — | — | — | $13,000 | — | |
| North Palm Beach County Airport - Airport Pavement Maintenance & Rehabilitation | F450006 | Airport - Pavement Maintenance | — | — | — | $4,000 | $4,000 | — | — | — | — | — | $4,000 | — | — | — | — | — | — | — | — | — | — | — | — | $4,000 | — | |
| North Palm Beach County Airport - Apron Rehab/ Expansion | F450004 | Airport - Apron Rehab/ Expansion | — | — | — | $5,500 | $5,500 | — | — | — | — | — | $5,500 | — | — | — | — | — | — | — | — | — | — | — | — | $5,500 | — | |
| North Palm Beach County Airport - Automated Weather Observing System (AWOS) Replacement | F450003 | Airport - AWOS Replacement | — | — | — | $300 | $300 | — | — | — | — | — | $300 | — | — | — | — | — | — | — | — | — | — | — | — | $300 | — | |
| North Palm Beach County Airport - Runway 14-32 | F450001 | Airport - Beach County Airport - Runway 14-32 | — | — | — | $32,000 | $32,000 | — | — | — | — | — | $32,000 | — | — | — | — | — | — | — | — | — | — | — | — | $32,000 | — | |
| North Palm Beach County Airport - Runway 9R-27L | F450005 | Airport - Airport - Runway 9R-27L | — | — | — | $1,000 | $1,000 | — | — | — | — | — | $1,000 | — | — | — | — | — | — | — | — | — | — | — | — | $1,000 | — | |
| Palm Beach County Airports - Airfield Maintenance & Repairs | DOA0001 | Airport - Airfield Maintenance & Repairs | — | — | — | $12,500 | $12,500 | — | — | — | — | — | $12,500 | — | — | — | — | — | — | — | — | — | — | — | — | $12,500 | — | |
| Palm Beach County Airports - Capital Projects Permits & Fees | DOA0004 | Airport - Capital Projects Permits & Fees | — | — | — | $2,000 | $2,000 | — | — | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | |
| Palm Beach County Airports - Consultant Services | DOA0002 | Airport - Consultant Services | — | — | — | $15,000 | $15,000 | — | — | — | — | — | $15,000 | — | — | — | — | — | — | — | — | — | — | — | — | $15,000 | — | |
| Palm Beach County Airports - Terminal Improvements | DOA0003 | Airport - Terminal Improvements | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Palm Beach International Airport - Access Control System Replacement | PBI0008 | Airport - Access Control System Replacement | — | — | — | $3,000 | $3,000 | — | — | — | — | — | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 | — | |
| Palm Beach International Airport - ADA Accessibility Improvements | PBI0017 | Airport - ADA Accessibility Improvements | — | — | — | $3,000 | $3,000 | — | — | — | — | — | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 | — | |
| Palm Beach International Airport - Air Cargo Building 1475 Landside PCC Repairs | PBI0021 | Airport - Cargo Building Repairs | — | — | — | $4,000 | $4,000 | — | — | — | — | — | $4,000 | — | — | — | — | — | — | — | — | — | — | — | — | $4,000 | — | |
| Palm Beach International Airport - Air Handler Unit | PBI0015 | Airport - Air Handler Unit | — | — | — | $4,654 | $4,654 | — | — | — | — | — | $4,654 | — | — | — | — | — | — | — | — | — | — | — | — | $4,654 | — | |
| Palm Beach International Airport - Airfield Electrical Vault Improvements | PBI0019 | Airport - Airfield Electrical Vault Improvements | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Palm Beach International Airport - Airport Layout Plan & Narrative Report | PBI0014 | Airport - Layout Plan | — | — | — | $250 | $250 | — | — | — | — | — | $250 | — | — | — | — | — | — | — | — | — | — | — | — | $250 | — | |
| Palm Beach International Airport - ARFF Building Replacement | PBI0003 | Airport - ARFF Building Replacement | — | — | — | $27,500 | $27,500 | — | — | — | — | — | $27,500 | — | — | — | — | — | — | — | — | — | — | — | — | $27,500 | — | |
| Palm Beach International Airport - Aviation Workers Security Screening | PBI0012 | Airport - Aviation Workers Security Screening | — | — | — | $250 | $250 | — | — | — | — | — | $250 | — | — | — | — | — | — | — | — | — | — | — | — | $250 | — | |
| Palm Beach International Airport - Bond Project Contingency | PBI0007 | Airport - Bond Project Contingency | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Palm Beach International Airport - Campus-Wide Bird Netting and Piping Replacement | PBI0022 | Airport - Bird Netting and Piping Replacement | — | — | — | $1,000 | $1,000 | — | — | — | — | — | $1,000 | — | — | — | — | — | — | — | — | — | — | — | — | $1,000 | — | |
| Palm Beach International Airport - Ceiling Mount Flight Information System | PBI0024 | Airport - Ceiling Mount Flight Information System | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Palm Beach International Airport - Common Use Ticket Counter and Backwall Improvements | PBI0023 | Airport - Common Use Ticket Counter and Backwall Improvements | — | — | — | $3,500 | $3,500 | — | — | — | — | — | $3,500 | — | — | — | — | — | — | — | — | — | — | — | — | $3,500 | — | |
| Palm Beach International Airport - Concourse B | PBI0001 | Airport - Concourse B | — | — | — | $94,000 | $94,000 | — | — | — | — | — | $94,000 | — | — | — | — | — | — | — | — | — | — | — | — | $94,000 | — | |
| Palm Beach International Airport - Councourses A, B, & C Re-Roofing | PBI0027 | Airport - B, & C Re-Roofing | — | — | — | $24,000 | $24,000 | — | — | — | — | — | $24,000 | — | — | — | — | — | — | — | — | — | — | — | — | $24,000 | — | |
| Palm Beach International Airport - Economy Parking Lot Rehabilitation | PBI0032 | Airport - Economy Parking Lot Rehabilitation | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Palm Beach International Airport - EMAS Replacement | PBI0031 | Airport - EMAS Replacement | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Palm Beach International Airport - Feature Signage, Wayfinding Signage, & Landscaping Improvements | PBI0009 | Airport - Feature Signage, Wayfinding Signage, & Landscaping Improvements | — | — | — | $2,250 | $2,250 | — | — | — | — | — | $2,250 | — | — | — | — | — | — | — | — | — | — | — | — | $2,250 | — | |
| Palm Beach International Airport - High Mast Lighting Renovation | PBI0018 | Airport - High Mast Lighting Renovation | — | — | — | $3,500 | $3,500 | — | — | — | — | — | $3,500 | — | — | — | — | — | — | — | — | — | — | — | — | $3,500 | — | |
| Palm Beach International Airport - Park and Ride Booth Replacements | PBI0030 | Airport - Park and Ride Booth Replacements | — | — | — | $2,000 | $2,000 | — | — | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | |
| Palm Beach International Airport - Parking Toll Plaza Canopy Structure Replacement | PBI0020 | Airport - Parking Toll Plaza Canopy Structure Replacement | — | — | — | $3,000 | $3,000 | — | — | — | — | — | $3,000 | — | — | — | — | — | — | — | — | — | — | — | — | $3,000 | — | |
| Palm Beach International Airport - PC Air | PBI0006 | Airport - PC Air | — | — | — | $3,269 | $3,269 | — | — | — | — | — | $3,269 | — | — | — | — | — | — | — | — | — | — | — | — | $3,269 | — | |
| Palm Beach International Airport - Perimeter Fiber Loop | PBI0028 | Airport - Perimeter Fiber Loop | — | — | — | $2,500 | $2,500 | — | — | — | — | — | $2,500 | — | — | — | — | — | — | — | — | — | — | — | — | $2,500 | — | |
| Palm Beach International Airport - Perimeter Road and VSR Pavement Rehabilitation | PBI0026 | Airport - Perimeter Road and VSR Pavement Rehabilitation | — | — | — | $10,000 | $10,000 | — | — | — | — | — | $10,000 | — | — | — | — | — | — | — | — | — | — | — | — | $10,000 | — | |
| Palm Beach International Airport - Rehabilitation of Airport Entrance Roadway | PHK0001 | Airport - Rehabilitation of Airport Entrance Roadway | — | — | — | $500 | $500 | — | — | — | — | — | $500 | — | — | — | — | — | — | — | — | — | — | — | — | $500 | — | |
| Palm Beach International Airport - Rehabilitation of Airport Parking Lot | PHK0002 | Airport - Rehabilitation of Airport Parking Lot | — | — | — | $1,000 | $1,000 | — | — | — | — | — | $1,000 | — | — | — | — | — | — | — | — | — | — | — | — | $1,000 | — | |
| Palm Beach International Airport - Replace 14 Passenger Boarding Bridges | PBI0025 | Airport - Replace 14 Passenger Boarding Bridges | — | — | — | $35,000 | $35,000 | — | — | — | — | — | $35,000 | — | — | — | — | — | — | — | — | — | — | — | — | $35,000 | — | |
| Palm Beach International Airport - Replace Terminal Canopies | PBI0029 | Airport - Replace Terminal Canopies | — | — | — | $2,500 | $2,500 | — | — | — | — | — | $2,500 | — | — | — | — | — | — | — | — | — | — | — | — | $2,500 | — | |
| Palm Beach International Airport - Revenue Control Building Replacement | PBI0005 | Airport - Revenue Control Building Replacement | — | — | — | $11,000 | $11,000 | — | — | — | — | — | $11,000 | — | — | — | — | — | — | — | — | — | — | — | — | $11,000 | — | |
| Palm Beach International Airport - Rotating Beacon Replacement | PBI0016 | Airport - Rotating Beacon Replacement | — | — | — | $500 | $500 | — | — | — | — | — | $500 | — | — | — | — | — | — | — | — | — | — | — | — | $500 | — | |
| Palm Beach International Airport - Runway 10R/28L | PBI0013 | Airport - Runway 10R/28L | — | — | — | $50,500 | $50,500 | — | — | — | — | — | $50,500 | — | — | — | — | — | — | — | — | — | — | — | — | $50,500 | — | |
| Palm Beach International Airport - Switchgear | PBI0010 | Airport - Switchgear | — | — | — | $22,500 | $22,500 | — | — | — | — | — | $22,500 | — | — | — | — | — | — | — | — | — | — | — | — | $22,500 | — | |
| Palm Beach International Airport - Taxiway Rehabilitation | PBI0004 | Airport - Taxiway Rehabilitation | — | — | — | $34,600 | $34,600 | — | — | — | — | — | $34,600 | — | — | — | — | — | — | — | — | — | — | — | — | $34,600 | — | |
| Palm Beach International Airport - Terminal & Concourse Modernization | PBI0011 | Airport - Terminal & Concourse Modernization | — | — | — | $40,000 | $40,000 | — | — | — | — | — | $40,000 | — | — | — | — | — | — | — | — | — | — | — | — | $40,000 | — | |
| Palm Beach International Airport - Terminal Connections | FDOT0086 | Airport - Terminal Connections | — | — | — | $13,000 | $13,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $13,000 | |
| Palm Beach International Airport - Terminal FIS Improvements | PBI0033 | Airport - Terminal FIS Improvements | — | — | — | $20,000 | $20,000 | — | — | — | — | — | $20,000 | — | — | — | — | — | — | — | — | — | — | — | — | $20,000 | — | |
| Palm Beach International Airport -Terminal Elevator Rehabilitation | PBI0002 | Airport - Terminal Elevator Rehabilitation | — | — | — | $17,100 | $17,100 | — | — | — | — | — | $17,100 | — | — | — | — | — | — | — | — | — | — | — | — | $17,100 | — | |
| 45th St and I 95 to Port of Palm Beach | FDOT0021 | Road Capacity - Modify Connector of I-95, 45th St, and Port of Palm Beach | — | — | — | $13,610 | $13,610 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $13,610 | |
| Mill and Repave Tropical Main Marginal along Berths #8 & #9 | PORT0031 | Seaport | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Port of Palm Beach - Replacement watermain along Avenue E between Port Road and Middle Rd | PORT0025 | Seaport | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Port of Palm Beach - Add additional lighting East to West | PORT0014 | Seaport | — | — | — | $450 | $450 | — | — | — | — | — | $450 | — | — | — | — | — | — | — | — | — | — | — | — | $450 | — | |
| Port of Palm Beach - Annex Property Improvements | FDOT0039 | Seaport - Seaport Capacity Project | — | — | — | $1,000 | $1,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,000 | |
| Port of Palm Beach - Berth 18 | PORT0010 | Seaport - Berth 18 | — | — | — | $12,000 | $12,000 | — | — | — | — | — | — | — | — | — | $12,000 | — | — | — | — | — | — | — | — | $12,000 | — | |
| Port of Palm Beach - Bulk Facility Containment Wall | FDOT0040 | Seaport - Intermodal | — | — | — | $2,000 | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | |
| Port of Palm Beach - Cargo Laydown - Phase 2 | FDOT0041 | Seaport - Intermodal Container Terminal | — | — | — | $2,500 | $2,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,500 | |
| Port of Palm Beach - Cathodic protection installation on seal walls port wide | PORT0019 | Seaport | — | — | — | $2,000 | $2,000 | — | — | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | |
| Port of Palm Beach - Cemex Demo & Land Improvements | FDOT0042 | Seaport - Seaport Capacity Project | — | — | — | $5,500 | $5,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,500 | |
| Port of Palm Beach - Container Yard / Bulk Improvements | FDOT0043 | Seaport - Intermodal Container Terminal | — | — | — | $5,000 | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | |
| Port of Palm Beach - Container Yard Crane Pad Improvements | FDOT0037 | Seaport - Seaport Capacity Project | — | — | — | $2,000 | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | |
| Port of Palm Beach - Cross reference utilities & site survey with field GIS survey | PORT0013 | Seaport | — | — | — | $25 | $25 | — | — | — | — | — | $25 | — | — | — | — | — | — | — | — | — | — | — | — | $25 | — | |
| Port of Palm Beach - Cruise and Port Administration Parking Structure | PORT0002 | Seaport | — | — | — | $52,000 | $52,000 | — | — | — | — | — | — | — | — | — | $52,000 | — | — | — | — | — | — | — | — | $52,000 | — | |
| Port of Palm Beach - Demo of Cold Storage Facility & Land Improvements | FDOT0044 | Seaport - Seaport Capacity Project | — | — | — | $1,300 | $1,300 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $1,300 | |
| Port of Palm Beach - General Cargo Warehouse Relocation | PORT0007 | Seaport - General Cargo Warehouse Relocation | — | — | — | $18,000 | $18,000 | — | — | — | — | — | — | — | — | — | $18,000 | — | — | — | — | — | — | — | — | $18,000 | — | |
| Port of Palm Beach - Harbor & Channel Improvements (USACE Inlet Exp) | FDOT0045 | Seaport - Dredge Harbor | — | — | — | $35,000 | $35,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $35,000 | |
| Port of Palm Beach - Install inner ring seals to the damaged 66" RCP under the main port entrance road | PORT0018 | Seaport | — | — | — | $500 | $500 | — | — | — | — | — | $500 | — | — | — | — | — | — | — | — | — | — | — | — | $500 | — | |
| Port of Palm Beach - Install new drainage system to west middle road and RR tracks | PORT0035 | Seaport | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Port of Palm Beach - Install storm drainage to all screening areas of the port | PORT0032 | Seaport | — | — | — | $5,000 | $5,000 | — | — | — | — | — | $5,000 | — | — | — | — | — | — | — | — | — | — | — | — | $5,000 | — | |
| Port of Palm Beach - Intermodal Cargo Transfer Facility | FDOT0046 | Seaport - Intermodal Container Terminal | — | — | — | $25,000 | $25,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $25,000 | |
| Port of Palm Beach - Mill and Repace Tropical Main Marginal along Berths #8 & 9 | PORT0020 | Seaport | — | — | — | $1,100 | $1,100 | — | — | — | — | — | $1,100 | — | — | — | — | — | — | — | — | — | — | — | — | $1,100 | — | |
| Port of Palm Beach - New Acquired Property Development (Clearing, Grading, Pavement, and Utilities) | PORT0001 | Seaport | — | — | — | $15,000 | $15,000 | — | — | — | — | — | — | — | — | — | $15,000 | — | — | — | — | — | — | — | — | $15,000 | — | |
| Port of Palm Beach - New Rail Yard Storage Tracks | PORT0008 | Seaport - New Rail Yard Storage Tracks | — | — | — | $10,000 | $10,000 | — | — | — | — | — | — | — | — | — | $10,000 | — | — | — | — | — | — | — | — | $10,000 | — | |
| Port of Palm Beach - On Dock Rail Expansion & Rail Bridge | FDOT0047 | Seaport - Internal Rail | — | — | — | $6,000 | $6,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,000 | |
| Port of Palm Beach - On Port Rail Facility Expansion Project | FDOT0048 | Seaport - Internal Rail | — | — | — | $7,275 | $7,275 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $7,275 | |
| Port of Palm Beach - Pave and Drain Mullins property | PORT0023 | Seaport - Pave and Drain Mullins property | — | — | — | $350 | $350 | — | — | — | — | — | $350 | — | — | — | — | — | — | — | — | — | — | — | — | $350 | — | |
| Port of Palm Beach - Perform Site Survey to get up-to-date Site Plan | PORT0012 | Seaport | — | — | — | $50 | $50 | — | — | — | — | — | $50 | — | — | — | — | — | — | — | — | — | — | — | — | $50 | — | |
| Port of Palm Beach - PIDP Internal Roadway Improvements | PORT0005 | Seaport - PIDP Internal Roadway Improvements | — | — | — | $6,000 | $6,000 | — | — | — | — | — | $6,000 | — | — | — | — | — | — | — | — | — | — | — | — | $6,000 | — | |
| Port of Palm Beach - PIDP Main Gate Improvements | PORT0004 | Seaport - PIDP Main Gate Improvements | — | — | — | $8,000 | $8,000 | — | — | — | — | — | $8,000 | — | — | — | — | — | — | — | — | — | — | — | — | $8,000 | — | |
| Port of Palm Beach - PIDP Rail Yard Improvements | PORT0003 | Seaport - PIDP Rail Yard Improvements | — | — | — | $11,000 | $11,000 | — | — | — | — | — | $11,000 | — | — | — | — | — | — | — | — | — | — | — | — | $11,000 | — | |
| Port of Palm Beach - Rail Yard Working Track Expansion | PORT0009 | Seaport - Rail Yard Working Track Expansion | — | — | — | $6,000 | $6,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,000 | $6,000 | — | |
| Port of Palm Beach - Relocate High-mast #26 to the East | PORT0015 | Seaport - Beach - Relocate High-mast #26 to the East | — | — | — | $120 | $120 | — | — | — | — | — | $120 | — | — | — | — | — | — | — | — | — | — | — | — | $120 | — | |
| Port of Palm Beach - Repair edges of the SOG deck of Berth #14 | PORT0028 | Seaport | — | — | — | $250 | $250 | — | — | — | — | — | $250 | — | — | — | — | — | — | — | — | — | — | — | — | $250 | — | |
| Port of Palm Beach - Repair of the RC pile cap between Berths #7 & 8 | PORT0022 | Seaport | — | — | — | $250 | $250 | — | — | — | — | — | $250 | — | — | — | — | — | — | — | — | — | — | — | — | $250 | — | |
| Port of Palm Beach - Repair the damanged pavement around all settled manholes | PORT0021 | Seaport | — | — | — | $500 | $500 | — | — | — | — | — | $500 | — | — | — | — | — | — | — | — | — | — | — | — | $500 | — | |
| Port of Palm Beach - Repave Slip 3 pavement area | PORT0034 | Seaport - Repave Slip 3 pavement area | — | — | — | $2,000 | $2,000 | — | — | — | — | — | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | — | |
| Port of Palm Beach - Replace and/or Repair failing water system within Tropical Main Marginal | PORT0026 | Seaport | — | — | — | $1,100 | $1,100 | — | — | — | — | — | $1,100 | — | — | — | — | — | — | — | — | — | — | — | — | $1,100 | — | |
| Port of Palm Beach - Replace or Recondition bad valves of the water mains port wide | PORT0016 | Seaport | — | — | — | $3,300 | $3,300 | — | — | — | — | — | $3,300 | — | — | — | — | — | — | — | — | — | — | — | — | $3,300 | — | |
| Port of Palm Beach - Replace the asphalt pavement of Tropical Main Marginal with RCC | PORT0033 | Seaport | — | — | — | $4,500 | $4,500 | — | — | — | — | — | $4,500 | — | — | — | — | — | — | — | — | — | — | — | — | $4,500 | — | |
| "Port of Palm Beach - Replace the overhead lines located within the footprint of PIDP project underground and extend power services to new PID buildings" | PORT0029 | Seaport | — | — | — | $2,500 | $2,500 | — | — | — | — | — | $2,500 | — | — | — | — | — | — | — | — | — | — | — | — | $2,500 | — | |
| Port of Palm Beach - Convert to underground power cables north of CEMEX | PORT0030 | Seaport | — | — | — | $1,500 | $1,500 | — | — | — | — | — | $1,500 | — | — | — | — | — | — | — | — | — | — | — | — | $1,500 | — | |
| Port of Palm Beach - Retrofit all High-mast & Low-mast with LED fixtures-mast (18 reamining) | PORT0024 | Seaport | — | — | — | $50 | $50 | — | — | — | — | — | $50 | — | — | — | — | — | — | — | — | — | — | — | — | $50 | — | |
| Port of Palm Beach - Secondary Gate Circulation Improvements | PORT0006 | Seaport - Secondary Gate Circulation Improvements | — | — | — | $200 | $200 | — | — | — | — | — | $200 | — | — | — | — | — | — | — | — | — | — | — | — | $200 | — | |
| Port of Palm Beach - Slip 2 Widening | PORT0011 | Seaport - Slip 2 Widening | — | — | — | $24,000 | $24,000 | — | — | — | — | — | — | — | — | — | $24,000 | — | — | — | — | — | — | — | — | $24,000 | — | |
| Port of Palm Beach - Slip No. 1 Redevelopment & Enhancement | FDOT0049 | Seaport - Seaport Capacity Project | — | — | — | $2,500 | $2,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,500 | |
| Port of Palm Beach - Slip No. 2 Redevelopment & Enhancement | FDOT0050 | Seaport - Seaport Capacity Project | — | — | — | $30,000 | $30,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $30,000 | |
| Port of Palm Beach - SouthGate Expansion & Cold Storage Conversion | FDOT0051 | Seaport - Seaport Capacity Project | — | — | — | $6,000 | $6,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $6,000 | |
| Port of Palm Beach - Survey the catch basins and storm sewers within the PIDP limits | PORT0017 | Seaport | — | — | — | $50 | $50 | — | — | — | — | — | $50 | — | — | — | — | — | — | — | — | — | — | — | — | $50 | — | |
| Port of Palm Beach - Survey the locations of water and fire valves | PORT0027 | Seaport | — | — | — | $50 | $50 | — | — | — | — | — | $50 | — | — | — | — | — | — | — | — | — | — | — | — | $50 | — | |
| Port of Palm Beach - Tropical Western Cargo Bldgs. Demo & Land Impv | FDOT0052 | Seaport - Seaport Capacity Project | — | — | — | $2,000 | $2,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $2,000 | |
| Port of Palm Beach - Waterside Cargo Terminal Redevelopment | FDOT0038 | Seaport - Intermodal Container Terminal | — | — | — | $4,000 | $4,000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $4,000 | |
| Port of Palm Beach/ Blue Heron Blvd SIS Connector - I 95 - Port of Palm Beach at US 1 | FDOT0053 | Seaport - Modify Connector | — | — | — | $23,500 | $23,500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | $23,500 | |